Perry County Active Transportation Plan
Text version of the plan
Perry County
Active Transportation Plan
2024 UPDATE
Acknowledgments
Ava Schmidt, Intern, Perry County Health Department
Ben Boyer, Bicycle and Pedestrian Coordinators, ODOT District 5
Ben Carpenter, Commissioner, Perry County
Bo Powell, Village Administrator, Village of New Lexington
Cait Harley, Safe Routes to School and Active Transportation Manager, ODOT
Fred Redfern, Mayor, Village of Crooksville
Jeff Ritter, President, Bike Buckeye Lake
Jenny LaRue, Creating Healthy Communities Coordinator, Perry County Health Department
Jordan Whisler, Local Safety and Active Transportation Manager, ODOT
Karen Pawloski, Transportation Planning Coordinator, Buckeye Hills Regional Council
Melissa Leckrone, Mobility Manager, Perry County Transit/Perry County Job and Family Services
Scott Ervin, Chief of Police, Village of New Lexington
Scott Owen, Comissioner, Perry County
Tom Johnson, Mayor, Village of Somerset
Ty Thompson, District Planning Engineer, ODOT District 5
William Barker, Sheriff, Perry County
Jessica Stroup, Human Resources Director, Perry County Board of Developmental Disabilities
David Shipps, AICP, Columbus Office Director, Toole Design
Michael Blau, AICP, Senior Planner, Toole Design
Julie Walcoff, Senior Planner, Toole Design
Sally Sharrow, AICP Candidate, Planner, Toole Design
Eric Davis, Intern, Toole Design
Galen Omerso, GIS Manager, Toole Design
Daniel Patterson, GIS Analyst, Toole Design
Megan Seib, Graphic Designer, Toole Design
Kathleen Hayes, PLA, Graphic Designer, Toole Design
K.C. Atkins, P.E., Midwestern U.S. Director of Engineering, Toole Design
Susan Daniels, P.E., AICP, Principal, Lawhon & Associates
Erin Grushon, AICP, Planner, Lawhon & Associates
Contents
Maps
Figures
Maps
Introduction
The 2019 Perry County Active Transportation Plan is the first official document to focus on pedestrian and bicycle improvements across the county. The Ohio Department of Transportation funded the plan’s development, and the Perry County Health Department led the planning process, with support from a consultant team led by Toole Design Group. The plan was updated in 2024 to reflect updated priorities. This chapter describes the Plan’s purpose and structure, defines active transportation, and examines the benefits associated with active transportation.
Background
Developing a plan that addresses both walking and bicycling can be challenging because of the different geographic scales of these modes. Walking can be difficult to address on a regional level because it often involves site-specific issues. In this Plan, walking recommendations are focused on local improvements. Bicycling projects, on the other hand, can be well-suited for a regional plan since bicycle trips are typically longer. For both walking and bicycling, the Plan aims to develop a safe, well-connected, countywide network that everyone can use, regardless of age or ability.
Planning Process and Document Structure
The Plan was created under the leadership of an Advisory Committee (described in Chapter 2) which ensured that it represented the variety of interests and stakeholders in Perry County. The process to develop the Plan began with an assessment of existing conditions and a review of other relevant plans and studies. Public input provided a foundation for recommendations, supplemented by a technical analysis of regional connectivity. Public input, among other factors, was also used to prioritize the recommendations. Finally, guidance for implementation was developed to help ensure that the recommendations in the Plan are realized.
This document summarizes the findings of the planning process. To tell the story of the state of active transportation in Perry County and provide a roadmap for achieving its envisioned future, the document is organized into the following sections:
- Community Engagement
- Existing Conditions
- Recommendations
- Implementation
Defining Active Transportation
“Active transportation” emphasizes the role of physically active forms of transportation in improving community health. It reinforces that bicycling and walking are valid forms of transportation, not just forms of recreation, and it is a more inclusive term that reflects the use of mobility assistance devices, such as wheelchairs and scooters, and other modes, such as skating or skateboarding. Active transportation also implies a more comprehensive approach to the transportation system which recognizes the importance of active transportation in accessing public transit, and addresses associated infrastructure like bike racks and wheelchair ramps.
Benefits of Active Transportation
This section describes some of the many benefits of active transportation, such as public health, economic development, quality of life, and environmental quality. It also explains why it is important to invest in the infrastructure and programs that support active transportation.
Public Health
The health of Perry County’s residents may be improved directly or indirectly through investments in active transportation infrastructure and programs. Active transportation, including walking and biking, can help people incorporate routine physical activity into their daily lives. This section describes the health benefits of active transportation, while Chapter 3 describes current health statistics of Perry County residents.
Physical Health
According to the U.S. Health and Human Services Department’s (USHHSD) Physical Activity Guidelines for Americans, 150 minutes of moderate-intensity aerobic activity (for example, brisk walking) each week reduces the risk of many chronic diseases and other adverse health outcomes.1 For young people ages 6–17 the USHHSD recommends participating in at least 60 minutes of physical activity every day. Engaging in physical activity beyond these amounts can impart additional health benefits.
Being overweight increases an individual’s risk for many chronic diseases, including hypertension, diabetes, osteoarthritis, cardiovascular disease and stroke, gallbladder disease, arthritis, sleep disturbances, mental health issues, breathing problems, and certain cancers.2 Increased opportunity for recreation and destination-oriented trips using active modes of travel are key to reducing obesity and, by extension, the risk for developing chronic diseases.
A 20-year study of 5,115 people in four U.S. cities found that walking and biking to work are associated with greater physical fitness among both men and women. Active commuting is also associated with lower obesity rates and better cardiovascular health for men. The study called strategies to enable and encourage active commuting “effective interventions to reduce obesity and improve cardiovascular disease risk.”3
Research has also found that the health benefits of bicycling instead of driving far outweigh the risks.4 For example, one study found that on average, individuals who shifted from driving to bicycling gained an estimated 3 to 14 months of life expectancy, compared to 5 to 9 days lost due to traffic crashes and inhaled air pollution.5
Mental Health
Physical activity, including walking and biking, can help prevent or treat some mental health conditions. Physical activity reduces depression, can improve the quality of sleep, and has been shown to improve cognitive function for older adults.6 Active transportation can also improve social conditions in communities, which contributes to positive mental well-being among residents. While there may be many reasons people feel socially isolated, land-use and transportation systems designed around the automobile can exacerbate these feelings. Car dependence reinforces solitary lifestyles and reduces opportunities for positive social interaction in pubic spaces,7 particularly in rural areas.
Economic Development
There is broad consensus across the country, and in Ohio, that investing in active transportation produces a positive return on investment for host communities. This is especially true when it comes to trails, which serve as major regional attractions for recreational riders. Trail-based tourism is an economic boon for many small communities, supporting local businesses, creating jobs, and increasing property values.8 For example, annual trail tourism spending along the Great Allegheny Passage in Maryland and Pennsylvania exceeds $40 million. It has resulted in 54 new or expanded businesses, 83 jobs, and $7.5 million in local wages every year.9
In Ohio, The Mid-Ohio Regional Planning Commission’s 2015 trails study found that one-fifth of Central Ohio Greenway users say they spend modest amounts of money, typically between $15 and $20 for refreshments and dining, on a trail visit. This is a significant amount when aggregated across all trail users. Sixty percent of study participants reported spending money on equipment, such as bicycles, shoes, and other items. These expenditures were substantial, exceeding $1,000 for bicycle purchases and over $100 for other items.10 Similar to the recent rise in ATV tourism (see Chapter 3), Perry County could see a significant boost in local economic activity with sustained investment in active transportation infrastructure.
Quality of Life
Comfortable and accessible bicycling and walking provide a host of quality of life benefits. They increase the number of travel options for everyone and can lead to a sense of independence in seniors, young people, and others who cannot or choose not to drive. Providing a high quality active transportation network is important for Perry County’s residents who do not have full access to a vehicle. This includes people who are under 16 years-old, unlicensed adults, suspended drivers, and people who live in households with more drivers than vehicles.
Active transportation options are associated with inviting places for people to live and work.11 Bicyclists often report greater satisfaction with their commute than people who drive to work.12 In communities that have invested in bicycling and walking infrastructure, bicyclists and pedestrian commuters report the highest levels of “commute well-being,” which is a measure of commute-based stress, confidence in arrival time, boredom or enthusiasm, excitement, pleasure, and ease of trip.
Additionally, more “eyes on the street” improve safety and support more activity: one study found that violence and the fear of violence prevent people from being physically active and spending time outdoors, causing a ripple effect of reduced social interactions, reduced community cohesion, and more barriers to community investment.13
Environmental Quality
Support for bicycling and walking comes in part from concerns about greenhouse gas emissions, stormwater runoff from highway facilities, and other environmental implications of widespread personal vehicle use.14 Shifting to bicycling and walking trips, and concentrating development in dense walkable and bikeable communities can reduce transportation-based emissions and sprawling land use that impacts the natural environment.15
Exhaust from automobiles increases local air pollution, which can cause or trigger respiratory and cardiovascular problems. People with sensitivities to air pollution, including older adults, children, and those with diseases such as asthma or congestive heart disease, are more likely to be affected by contact with pollution from particulate matter, which includes pollutants from automobile exhaust. 16,17 Multiple studies have found that low-income, minority communities bear the greatest burden of auto-related emissions due to proximity to high-volume roads.18, 19, 20 Reducing the number of vehicles on the road can reduce air pollution and improve air quality.21 Researchers have proposed that increasing the supply of active transportation facilities (e.g., sidewalks, bike paths, etc.) can help reduce exposure to harmful pollutants.22
Community Engagement
Community engagement was an essential tool in the plan development process. Involving the public builds trust in the Plan and improves the overall quality of the findings. Two primary means of public involvement were used during plan development: a project advisory team and public meetings and events.
Kick Off In March, 2019, the Perry County Active Transportation Workshop convened stakeholders from across the county. The workshop served as the unofficial kickoff for the Perry County Active Transportation Plan. Organized by the Perry County Health Department and the Ohio Department of Health, the purpose of the workshop was to:
- Identify Perry County’s challenges, strengths, and opportunities in active transportation;
- for the planning process;
- coordination on active transportation planning; and
- n active transportation priorities and planning involvement.
Approximately 30 people were in attendance, including elected officials, law enforcement, active transportation advocates, health department staff, state agencies, regional planning organizations, local governments, and community members.
Participants engaged in a mapping activity to identify the gaps, barriers, generators, and other challenges and opportunities around bicycling and walking in Perry County. The consultant team that led the workshop used a real-time, online polling platform to generate discussion and solicit feedback on what active transportation plan components are most important to include in Perry County’s plan.
The brainstorming, open discussion, and mapping activity successfully engaged workshop participants in developing a vision and priorities for the Perry County Active Transportation Plan.
Advisory Team Meetings
The Perry County Active Transportation Plan was guided by an Advisory Team comprised of local, county, and state agency representatives as well as local stakeholders. Advisory Team members are listed under Acknowledgments at the beginning of this document. The Advisory Team met three times over the course of plan development in Fall 2019. All meetings took place in the Perry Behavioral Health Choices Activity Center in New Lexington.
Meeting One
The first meeting occurred in August at the beginning of the planning process. Team members discussed their aspirations for the Plan and reviewed completed active transportation plans for other rural areas to understand the typical content and outcomes of a planning process. The team agreed that local improvements within communities were a priority, which was the genesis of the Pedestrian Priority Areas described in Chapter 4. Connections to other counties were also considered important to tie Perry County in with regional active transportation initiatives, such as state bicycle routes and trails in neighboring counties.
Following the meeting, Perry County staff and the consultant team embarked on a tour of the county to observe bicyclist and pedestrian issues in different communities. The group visited New Lexington, Shawnee, New Straitsville, Thornville, and Thornport. The consultant team visited Somerset, Crooksville, and rural parts of the county on subsequent trips.
Meeting Two
During the second meeting in September, the Advisory Team reviewed and discussed the partially completed plan, which included the existing conditions analysis and preliminary recommendations. The consultant team explained the recommendations and rationale behind the proposed network. Advisory team members provided feedback on specific recommendations and routes, as well as the overall flow and structure of the document.
Meeting Three
The third and final meeting occurred in November. The Advisory Team reviewed an updated draft of the plan, including results from a project prioritization exercise. Team members voted on their top priority projects, which were factored into the final prioritization scores. Minor edits and additions were suggested for the final draft, which individual members of the Advisory Team reviewed in December.
Pop-Up Events
Pop-up events have a broader reach than conventional public meetings. By leveraging existing events or popular destinations, the project team reached a wide cross-section of Perry County residents, especially those who might not want to or be able to participate in online or traditional forms of engagement.
Pop-up events included a booth with display boards explaining the Plan’s purpose, handouts, and interactive mapping. This approach allowed residents to talk directly with each other and the project team about their mobility needs.
The project team held six pop-up events over the course of the project. The purpose of the pop-up events was two-fold: to gather information about existing walking and bicycling conditions during the first half of the project, and to share preliminary recommendations with the public during the second half.
Information Gathering
Perry County Health Department staff and consultant team members attended a series of events in Summer and Fall 2019 to gather public feedback about active transportation in Perry County.
- Perry County Fair - With a broad appeal and wide demographic reach, the Perry County Fair was an ideal venue for kicking off public engagement. The Plan’s mapping activity booth was on display for two days, during which time dozens of people marked their preferred walking and bicycling routes on map boards and identified gaps and barriers that prevent them from using active transportation. Topics of interest included sidewalk gaps, lack of signage, better transportation options for seniors, and access to parks and recreational areas.
- Back to School Bash - Every year, the Perry County Back to School Bash serves thousands of families from across the county by providing school supplies and other resources. The project team spoke to dozens of families about transportation to school. Many parents expressed concerns about their children walking or bicycling due to high speeds, long distances, and lack of sidewalks or other facilities.
- Tour de Buckeye Lake - Organized by Bike Buckeye Lake, Tour de Buckeye Lake attracts 500 bicyclists from across Ohio every year. The route circumnavigates the six-mile-long Buckeye Lake on the fourth Saturday of August each year, including a 25-mile main route with optional spurs. Riders come from as far as Dayton and Cleveland, but Perry County residents were represented as well. Many riders confirmed that bicycling infrastructure would encourage them to visit Perry County for recreational riding.
Information Sharing
With a mostly completed draft in hand, the consultant team and Perry County Health Department staff organized a second round of pop-up events to present draft plan recommendations. They solicited feedback and public impressions of the draft plan and asked the public to vote on their top-priority projects.
- Perry Behavior Health Choices Activity Center - The project team held an open house and invited community groups to vote on their preferred bicycle and pedestrian projects over two days in November.
- Pre-Thanksgiving Event - The project team set up a display in a grocery store parking lot the Monday before Thanksgiving, to capture as much public feedback as possible. Several dozen people voted on their top projects, which were factored into the final prioritization scores.
- Perry County Health Department - The proposed active transportation network was also on display at the health department in November and December, where department staff and members of the public could vote on their preferred projects.
2024 Plan Update
Perry County Health Department hosted a workshop in May 2024 to share progress on the plan, discuss priorities for the next five years, and add additional projects. The workshop was attended by 20 people representing organizations and jurisdictions throughout the county who provided their input. The Creating Healthy Communities coordinator also coordinated individually with each jusrisdiction to gather updates and determine the priorities as presented in this plan update.
Stakeholders at the March, 2019 Active Transportation Workshop
Perry County Back to School Bash
Perry County Fair
Tour de Buckeye Lake
Perry County Back to School Bash
November open house
Tour de Buckeye Lake
Existing Conditions
This chapter examines several elements of Perry County’s transportation system. It presents a socioeconomic profile of the county, reviewing population trends and income, employment, and public health data. A plan and policy review summarizes existing active transportation and related efforts to date, framing the current planning process as a logical next step in the county’s active transportation evolution. This chapter also summarizes existing programs that support active transportation. An infrastructure analysis provides an overview of the transportation system, describing the roadway network, traffic volumes, travel patterns, and crash data and inventorying active transportation facilities. A gap analysis synthesizes these elements into a list of active transportation weaknesses and challenges in Perry County, which are addressed in Chapters 4 and 5.
Sociodemographic Profile
This section discusses general demographic information about Perry County, as well as public health statistics. Perry County is 97% white and has a population of approximately 36,000 (0.3% of Ohio’s total population). The region is largely rural and is characterized by low income, poor health, and low educational attainment. County residents face many challenges based on its limited resources and geographic isolation. 15.4% of residents over 25 years old do not have a high school diploma or GED and 19.2% of residents live below the federal poverty line. The largest industries are health care, manufacturing, retail, and public agencies, including the County government and school districts.
Income and Poverty
In 2017, the median household income in Perry County was $46,477, approximately $6,000 less than the median household income for Ohio. This number is higher than in neighboring rural counties, such as Muskingum and Morgan, but lower than in nearby suburban counties, such as Fairfield. As of June 2019, the unemployment rate was 4.8% compared with Ohio’s rate of 4.2%. The Centers for Disease Control (CDC) notes that high poverty and unemployment rates, low education rates, and other social determinants of health are associated with poorer health status.
Perry County Job and Family Services provided employment search assistance to over 3,000 individuals in 2017 and education and employment services to 52 dislocated workers. Overall, the county is economically depressed, but wealth and income vary widely between communities. Income generally falls as one travels south through Perry County. The northern third of the county, closest to Buckeye Lake, Newark, and other urban areas, has the highest median income, at over $65,000. This areas includes Thornport and Thornville. The middle third of the county, including Somerset, has the second highest income, at over $55,000. The southern third of the county has median household incomes between $32,000 and $48,000. The census tracts encompassing New Lexington, in the center of the county, and Crooksville and Roseville, in the eastern part of the county, buck this geographic trend. They have the lowest median household incomes, between $32,000 and $34,000.
These numbers speak to a disconnect between northern Perry County, which is well-connected to larger communities and with convenient access to interstate commerce via I-70, and southern Perry County, which is sparsely populated and isolated. Much of the growth and development in the past 15 years has occurred in the northern part of the county, which is reflected in the higher incomes in communities around Buckeye Lake.
Communities in northern Perry County
are more affluent and better connected
than the rest of the county.
Social Vulnerability
The CDC created the Social Vulnerability Index to measure the degree to which a community is able to prevent suffering and financial loss in the event of a disaster. The SVI assigns a composite score to every census tract based on factors like income, education, housing, and transportation. SVI is measured from zero to one; higher SVI values indicate greater vulnerability. As Map 1 shows, Perry County’s SVI scores generally mirror the income pattern described above, with higher SVI scores in the southern part of the county. The census tracts covering New Lexington, Junction City, Shawnee, and New Straitsville each have scores of 0.78; the census tract for Rendville, Corning, and Hemlock has a score of 0.57; the Crooksville and Roseville census tract is 0.69; Somerset’s census tract is 0.46; and Thornville and Thornport’s is 0.43.
These data indicate a need for social services, including housing and transportation. While active transportation is not a panacea to solving Perry County’s socioeconomic challenges, it would benefit all income levels by providing safe, comfortable, and convenient walking and bicycling opportunities for the entire community; however, county leaders must build consensus between disparate communities on the importance of bicycling and walking throughout the county to develop a connected and accessible active transportation system for people of all backgrounds.
Equity Analysis
As part of its statewide bicycle and pedestrian plan, Walk Bike Ohio, the Ohio Department of Transportation (ODOT) performed an equity analysis for the entire state. It created a composite equity score for every census tract in the state, with scores assigned based on the presence of non-white groups, youth, older adults, poverty, low educational attainment, limited English proficiency, and low motor vehicle access. Higher scores correspond to a higher presence of underserved groups and indicate a greater need to increase equitable outcomes. Scores in Perry County vary widely and are a reflection of communities’ social vulnerability, as identified in the CDC analysis. The New Lexington and Shawnee census tracts are the highest scoring areas in the county, followed by the southwest quadrant of the county, including New Straitsville, Junction City, and Hemlock. Along with other criteria, the Walk Bike Ohio equity analysis scores are used to prioritize projects in Chapter 5.
Together, the CDC’s SVI tool and ODOT’s equity analysis indicate an undeniable need for investment in Perry County’s most impoverished communities. In addition to jobs, education, and social services, walking and bicycling infrastructure must be a part of the solution to improve quality of living in these communities.
Public Health
The relationship between active transportation and chronic disease is noteworthy since most chronic conditions can be prevented by getting the recommended amounts of physical activity. As of 2014, 60% of American adults had at least one chronic condition, such as obesity or heart disease, and 42% had more than one. The Centers for Disease Control and Prevention recommend 2.5 – 5 hours of moderate-intensity physical activity weekly for adults. Reaching this goal is easier when it is part of a daily routine. Twenty-eight percent of adults in Perry County report no physical activity, which is higher than the statewide average of 25%,23 and 35% of adults in the county have obesity, which is higher than the state average of 33.8%.24 People are more likely to walk, bicycle, or take the bus while going about their daily business if education and infrastructure improvements make the active choice the easy choice. The strategies and recommendations in this plan will make it safer and more comfortable for people to walk, bike, or take the bus to meet their physical activity goals.
Plans, Policies, and Supportive Programs
This plan builds on prior plans and initiatives developed by entities within Perry County. It relies on these plans for existing conditions data, issue identification, and recommendations support. The graphic to the right shows key milestones of Perry County’ active transportation evolution.
Local Plans and Policies
In 2013 the Villages of Thornville and Glenford developed a school travel plan to help improve the safety of students walking or bicycling to school. As a result of the plan, students learned about active transportation safety and received encouragement items. Since then, momentum has stalled. This planning process may be a good time to reinvigorate interest in Safe Routes to School.
In 2018 the Village of Somerset passed a Complete Streets Policy. The policy established Somerset’s vision of an equitable, balanced, and effective transportation system where every roadway user can travel safely and comfortably, providing the best possible blend of service, mobility, and safety for residents of all ages, income levels, and abilities.
Locally Developed Coordinated Public Transit-Human Services Transportation Plan
In 2017, Perry County Job and Family Services developed a plan to identify and prioritize community transportation needs. The Locally Developed Coordinated Public Transit-Human Services Transportation Plan was approved by ODOT and fulfills the county’s requirements for federal transit dollars. Developed with community input, the plan focuses on serving individuals without private vehicle access, including seniors, individuals with disabilities, and people with low incomes. While transit is a valuable tool to support these disadvantaged groups, it is also a community-wide benefit that supports economic development, individual mobility, and safer roads. The plan includes an assessment of available transit services offered by public and private agencies in Perry County and a transportation needs and gaps analysis. It establishes goals and strategies for addressing unmet mobility needs and action steps to achieve those goals. Goals related to active transportation include Complete Streets policy adoption, sidewalk network expansion, and bike lane installation on SRs 13 and 93. As a result of the plan, Perry County hired its first county-wide mobility manager in 2018.
Carroll Street Road Safety Audit
In 2019, ODOT, Buckeye Hills, Perry County Health Department, Perry County Job and Family Services, and a consultant team conducted a road safety audit (RSA) of the Carroll Street corridor in New Lexington. The RSA analyzed pedestrian and vehicular activity along the corridor and recommended infrastructure improvements to create a safer walking environment. Active transportation related recommendations include the following:
- Reprogram traffic signal at Lincoln Park Drive to eliminate conflict between pedestrians and turning vehicles.
- Replace and update existing pedestrian signals and pushbuttons.
- Install ADA-compliant pedestrian curb ramps during next resurfacing/reconstruction of Carroll Street.
- Construct sidewalk and/or multi-use path along one or both sides of Carroll Street.
- Consider installation of corridor lighting along Carroll Street and coordinate pole locations with any new or proposed pedestrian facilities.
- Install marked crosswalk with rectangular rapid flashing beacon (RRFB) at East Jefferson Street intersection.
The Carroll Street corridor holds regional significance as the county’s primary commercial district. As such, Carroll Street should be included in any discussion about active transportation improvements in Perry County. More information on proposed improvements can be found in Chapter 5.
Ohio Action Institute for Active Transportation
In 2017, Perry County participated in an Action Institute hosted jointly by ODOT and the Ohio Department of Health. The Action Institute helped local communities develop work plans for active transportation, including objectives for education, infrastructure, planning, and policy. It established an Active Transportation Team in Perry County, including the Village of Somerset’s mayor, the Perry County Health Department, a New Lexington School Board Member, and Perry County Commissioners. The team developed a plan to improve safety and increase the number of residents and visitors participating in active transportation.
Perry County has already achieved certain work plan objectives, including:
- Sharrows and signage installed on Tile Plant Road.
- Increasing the use of Your Move educational materials provided by ODOT.
- Developing a rural bike share program in New Lexington, which is expected to become a model for other areas in Ohio.
- Launching the process for this countywide active transportation plan.
Bike Buckeye Lake
Bike Buckeye Lake was established by residents of Fairfield, Licking, and Perry Counties in 2015 to coordinate a safe multi-use trail system linking towns, villages, and tourist locations around Buckeye Lake. These linkages will connect to surrounding communities, eventually feeding into the State and U.S. Bike route system in Ohio and beyond. A major regional destination for recreational bicycling and walking, Buckeye Lake is an important asset for Perry County to attract visitors and encourage residents to use active transportation. Bike Buckeye Lake hosts a group ride every year to raise awareness about bicycling and emphasize the need for expanding bicycle infrastructure. Tour de Buckeye Lake attracts 500 bicyclists from across Ohio every August. The route circumnavigates the six-mile-long Buckeye Lake, including a 25-mile main route with optional spurs.
Bike Buckeye Lake developed a Five-Year Strategic Plan in 2019 to promote the development and maintenance of a multi-use trail system around the lake. The proposed 22-mile trail network is partially built, with an existing four-mile segment spanning parts of the north shore along Buckeye Lake Dam in Fairfield and Licking Counties. The proposed alignment would extend this trail into Perry County, along the lake’s eastern edge, and use a combination of trails and on-road segments to connect to the western edge and start of the existing trail in Fairfield County. Bike Buckeye Lake estimates the cost of developing the remaining trail system at approximately 12 million dollars, including segments in surrounding counties.
Infrastructure
Transportation System Overview
Perry County is on the cusp of Ohio’s Appalachian region. Flat farmland and subtle terrain in the northern half of the county give way to rolling foothills farther south, which pose obstacles for street connectivity. In New Straitsville, Shawnee, Corning, and other communities in southern Perry County, local street networks are disconnected and bisected by water features and steep terrain. Many communities are oriented along state routes that follow the relatively flat terrain of riverbeds or abandoned railroads. Local streets branch off from these main roads and up sharp inclines that are generally not suitable for bicycling. Most local roads in the small, rural communities throughout the county do not have sidewalks. Some villages are served by local libraries, post offices, and churches, but grocery stores and other daily needs are usually farther away. The difficult terrain combined with a lack of infrastructure and long distances to destinations make these areas inhospitable for people walking and bicycling.
Perry County’s transportation system is a reflection of its rural character. The majority of road miles in the county are low-volume local routes (county roads and local streets within village limits). Major roads connect Perry County to neighboring regions and the rest of the state. These include 16 state routes, comprising 373 miles of ODOT-maintained roads. US 22 is the only US route that traverses the county, traveling northeast from Lancaster, into Perry County and through Somerset, and onto Zanesville. Interstate 70 (I-70) is 1.5 miles from the county’s northern border, connecting northern Perry County to Columbus and other destinations across Ohio.
Perry County’s transportation system is a reflection of its rural character.
New Lexington, the county seat, is served by a moderately connected street grid, with Main Street, Broadway Street, and Carroll Street as the primary corridors. Other communities in the county are oriented along state routes that connect to small grids of residential streets. Beyond the developed areas in the county, the transportation network comprises rural county roads and state routes.
Most roads in Perry County carry less than 500 vehicles per day. In the county’s larger communities, main roads carry between 6,000 and 9,500 vehicles daily. These include SR 13 through New Lexington and Somerset, SR 93 through Crooksville, and East Brown Street/Brook Street in New Lexington. These traffic volumes are similar to those of other rural counties in Central and Southeastern Ohio.
Travel Patterns
The US Census collects information on travel patterns, including methods of travel and commute times. In Perry County, these data reflect the auto-oriented transportation networks that many rural communities have. The vast majority of commuters (84%) drive alone. Alternative modes, such as walking, bicycling, and transit, are not prevalent for commuting in Perry County. Only 1.6% of people walk to work, 0.8% take transit, and virtually no residents of Perry County bicycle to work; these data do not capture people using alternative modes for other types of trips. The average commute time is 30 minutes and average vehicle ownership is two cars per household, similar to neighboring counties.
Thesenumbers may be disheartening for communities who want to encourage walking, bicycling, and transit, but looked at another way, they also indicate Perry County’s vast potential for growth in active transportation. With the right infrastructure improvements, supportive policies, and programs in place, Perry County’s communities can boost walking, bicycling, and transit mode share, becoming role models for other small towns and rural areas who want to diversify their transportation choices.
With the right infrastructure improvements, supportive policies, and programs in place, Perry County’s communities can boost walking, bicycling, and transit mode share.
Bicycle Facilities
There are virtually no existing bicycle facilities or routes within Perry County. This is common in many rural parts of Ohio, due to long distances between destinations, difficult terrain, and auto-oriented transportation networks. Because Perry County is building its bicycle network from scratch, there is ample opportunity to introduce innovative bicycle infrastructure that can accommodate people of all ages and abilities, and strengthen connections between communities.
Regional Network
Ohio is establishing a network of State and US bicycle routes that will span over 4,000 miles, combining on and off-street facilities. There are no routes in Perry County, but several routes travel through adjacent counties: State Bike Routes (SBR) 65 and 33 in Fairfield County, SBR 65 in Hocking County, SBRs 65 and 20 in Athens County, SBR 20 in Morgan County, US Bike Route (USBR) 50 in Muskingum County, and SBR 65 and USBR 50 in Licking County. Ensuring that Perry County is not isolated from the statewide and national routes in Ohio should be a consideration during implementation of this Plan.
On-Road
Bicycles are permitted to ride on most roads in Perry County, but there are almost no on-road bicycle facilities in the county. Shared lane markings, or sharrows, on Tile Plant Road are an exception. On-road bicycle facilities, such as wide paved shoulders and bike lanes, are an important part of any bikeway network. They improve safety, encourage more ridership, connect people directly to their destinations, and provide a degree of separation from motorized traffic. They also increase the visibility of bicyclists, and signal to motorists that people are allowed – and encouraged – to bike on the road.
Off-Road
Perry County does not have any off-road bicycle facilities, such as shared use paths or trails. In the 1980’s, the county had the opportunity to convert an abandoned railroad into a trail that would have spanned the county from north to south. This trail could have formed the basis of the county’s active transportation network. Shawnee and other communities near the abandoned railroad could have benefited economically, joining the ranks of Xenia, Canal Fulton, and other communities across Ohio that have embraced trail tourism. At the time, the proposed trail in Perry County did not receive community support. This planning process could revive it. Nearby Athens County, with similar geography, features the 21-mile Hockhocking Adena Bikeway, connecting Nelsonville to Athens and Wayne National Forest. In Washington County, Marietta’s riverfront trail is a valuable community asset, and bicycle advocates in Belpre are lobbying for a trail to connect with neighboring Parkersburg, West Virginia. Efforts are underway to connect the recently completed Buckeye Lake Dam trail to Perry County. Unpaved trails are also growing in popularity. In 2018, Wayne National Forest announced plans for an 88-mile single-track trail in Athens County. The Baileys Mountain Bike Trail System will connect to the Hockhocking Adena Bikeway and create a new recreation area as part of a sustainable economic development strategy for the surrounding communities. Given this activity, Perry County could capitalize on regional momentum around trail development and leverage state and federal funding sources to connect its active transportation network with neighboring communities.
Pedestrian Facilities
Recent Accomplishments
Several communities have made improvements to their pedestrian networks in recent years. In 2017, Roseville developed a multi-use walking trail in the City Park. In 2018, Somerset made multiple improvements to its pedestrian network, including ADA-accessible curb ramps, new sidewalks on Main Street and Columbus Street, new marked trails at the Finck’s Nature Preserve, and new connecting sidewalks in areas without them. Other areas are planning additional active transportation routes around the county, including the Emerald Necklace Greenway in Somerset and the Shawnee Area Trail System. New Lexington has also improved walkability in recent years through crosswalks and marked walking paths where sidewalks are lacking, and the village has plans for additional investments in its sidewalk network (see Sidewalk Summary). Crooksville and Corning recently received $750,000 and $375,000, respectively, in revitalization funding, some of which will go toward sidewalk improvements.
Sidewalks
Sidewalks are intended for exclusive use by pedestrians. They are adjacent to but separated from the roadway by a curb or buffer, such as a treelawn or drainage ditch. As roadway speeds and volumes increase, a greater degree of separation is needed to maintain a safe and comfortable walking environment for pedestrians. Sidewalks are the primary type of pedestrian infrastructure in most communities. Typically, sidewalk networks are supported by and connect to other facilities, such as curb ramps, crosswalks, warning signage and flashing beacons, refuge and crossing islands, shared use paths and sidepaths, and curb extensions. Most of these elements are lacking in Perry County but could be included with improved pedestrian facilities.
Sidewalks are confined largely to densely settled developments in Perry County, including New Lexington, Crooksville, Somerset, Roseville, and Thornville as well as some smaller isolated communities, such as New Straitsville, Shawnee, and Junction City.
Crosswalks
Marked crosswalks are rare outside town centers in Perry County. In New Lexington, there are crosswalks along Main Street, Broadway Street, and Mill Street, where there are many shops and businesses within walking distance of homes. Crosswalks are missing on Carroll Street, which is dominated by fast food chains, auto shops, big box stores, and other auto-oriented developments. Carroll Street leads to New Lexington Elementary, Middle, and High Schools on Panther Drive, where pedestrian facilities are lacking entirely. Students who do walk to school have created a goat path from the Creno’s Pizza and Church of Christ parking lots up the hill to Panther Drive and the school campus. Goat paths, or desire lines, are unpaved trails created by frequent use, typically along a roadway, that indicate a need for pedestrian facilities where none exist.
Trails
In addition to sidewalk networks, several communities do have off-road walking paths, including:
- Somerset Community Park – half-mile track
- Finck’s Nature Preserve (Somerset) – three trails
- New Lexington Schools – quarter-mile track and one-mile paved walking trail
- Crooksville Schools – paved walking trail
- Southern Local Schools (Miller Middle and High Schools) – one-mile hiking trail
- Glenford – three quarter-mile trail
The Emerald Necklace Greenway is a trail system planned to connect Buckeye Lake to Wayne National Forest. It would run through rural Perry County roads and abandoned railroad corridors. The Somerset portion of the trail is already built.
Alternative Modes
Bicycling and walking are not the only alternatives to private automobile travel. Ten percent of the population uses carpooling to commute to work, as is evidenced by the well-used park and ride lot at the SR 13 and I-70 interchange. Other alternative modes are described below.
Transit
Fewer than 1% of county residents use transit to commute to work, although expanding transit service could increase this number. Perry County does not have the high-density development needed to support frequent fixed-route transit service, but it does have rural transit options that are common in much of the state. There are plans for specified routes on certain days to popular destinations. Perry County Transit (PCT) is the area’s demand response transit service. Over 40 employees and 31 vehicles serve the entire county, which is divided into seven zones with varying fares. The starting fare for trips within New Lexington is two dollars; trips outside of the New Lexington area range from $2.50 to $7.50, and there is a $10 fee for out of county trips. All trips must be scheduled at least 24 hours in advance and are subject to availability. Annual one-way trips total over 56,000. Fourteen other entities, including public agencies, private companies, and nonprofits provide direct transportation services in Perry County.
Data collected by PCT show that employment destinations are the most common trip type, followed by medical, shopping, and recreation. After Perry County Transit, Perry County Job and Family Services is the second-largest transportation provider in the county, with over 10,000 annual one-way trips. The Perry County Mobility Manager helps schedule trips and identify the best options for riders to get to their destination across all of these providers.
Because PCT generally operates during regular business hours, with extended hours on Wednesday evenings and very limited weekend service, it is not a viable transportation option to second and third shift jobs. Transportation costs are also a barrier due to high poverty rates in much of the county. PCT started installing bike racks on transit vehicles in 2019, which offers customers more flexibility in reaching their destinations.
All-Terrain Vehicles
All-terrain vehicles (ATVs) are used in Perry County for both transportation and recreation. Residents use ATVs to travel short distances within communities. Over 120 miles of public and private trails in Wayne National Forest attract recreational users from across the state and stimulate economic development in the southern part of the county. Capitalizing on this trend, local entrepreneurs have opened private trail networks and campgrounds, such as Begley’s ATV Campground in New Straitsville and Tecumseh Trails near Shawnee. Five townships, including Roseville and New Straitsville, have passed ATV-friendly resolutions, allowing them to operate adjacent to roads where state law would normally restrict them. New Straitsville passed such a law in 2008, when Wayne National Forest sold over 21,000 ATV permits. Visitor numbers have dropped since then, due in part to increased enforcement against alcohol use on ATV trails and a lack of convenient fuel sources, but ATV tourism continues to be a mainstay of the local economy.
Crash Analysis
Five years of crash data were reviewed and mapped using ODOT’s GIS Crash Analysis Tool; this exercise identified problem locations for people walking and bicycling. During the time period reviewed (2015-2019), there were 15 crashes involving bicyclists and pedestrians in Perry County, four of which resulted in serious injuries. Crashes occurred in New Lexington, Somerset, Crooksville, and Junction City, and on rural state routes in the northern part of the county. The majority of the crashes involved pedestrians; bicyclists were involved in only three crashes. The most common crash context was pedestrians in urban areas during early morning or evening hours.
Gap Analysis and Change Catalysts
A gap analysis examines physical breaks in an active transportation network, such as sidewalk gaps or missing connections between bicycle facilities. It can also identify deficiencies in policy, planning, and programming that pose barriers to walking and bicycling. Because active transportation facilities are largely absent within Perry County, a comprehensive inventory of network gaps is unnecessary. Instead, this section discusses two countywide deficits that must be addressed to improve active transportation conditions. Changes to Perry County’s auto-oriented culture and political priorities are critical to implementing this Plan.
Culture
During community engagement, many people expressed support for expanding walking and bicycling options in Perry County. Community members want to walk to schools, parks, libraries, grocery stores, and other destinations to meet their daily needs; however, very few residents walk or bicycle for transportation because they feel unsafe doing so. Speeding vehicles, lack of street lighting, difficult terrain, and long distances deter most people from using active transportation. In addition to these built environment barriers, social and environmental factors also discourage people from walking and bicycling in certain areas, especially for families with young children. As a result, most people drive to their destinations if they are able to do so. Some people related their surprise when seeing pedestrians and bicyclists on the road, an indication of Perry County’s auto-oriented culture.
Establishing a culture that is friendly to people walking and bicycling is a years-long process that requires strong leadership, infrastructure improvements, and a commitment to safety. Most importantly, communities must rethink the way in which they approach transportation planning. Auto-centric policies that prioritize vehicle throughput, level of service, and motorist convenience over all else are detrimental to vulnerable road users. Community leaders and decision makers across the county must recognize active transportation as a valid means of travel, invest in much-needed infrastructure, and establish programs and policies that encourage residents to walk and bike.
Priorities
Communities face a number of challenges, from healthcare access to unemployment, and while active transportation can play a key role in fixing these issues, it often falls to the bottom of the list. Most local governments in Perry County do not have the funding or ability to invest in active transportation improvements. There are notable exceptions, such as Somerset’s Complete Streets policy. However, attention to improving walking and bicycling conditions is generally absent in many local communities. Given the lack of local resources available, countywide leadership through this plan is especially important.
Thornville
Distance to I-70
Somerset
New Lexington
Median Household Income
Crooksville
New Straitsville
CDC’s Social Vulnerability Index (SVI) Indicators
Socioeconomic Status
O v e r a l l V u l n e r a bi l i t y
Below Poverty
Unemployed
Income
No High School Diploma
Aged 65 or Older
Household Composition & Disability
Aged 17 or Younger
Civilian with a Disability
Single-Parent Households
Minority
Minority Status & Language
Speak English “Less than Well”
Multi-Unit Structures
Housing & Transportation
Mobile Homes
Crowding
No Vehicle
Multi-Unit Structures
Group Quarters
Poverty in Perry County
Costs for healthcare, transportation, child care, food, and other essentials take a toll on families in poverty.
- Social Vulnerability Index
High Need
Low Need
High SVI
Low SVI
- Walk Bike Ohio Equity Analysis
High Need
Low Need
Thornville & Glenford
School travel plans
Perry County’s Active Transportation Timeline
2013
2014 established
2015
2016
Action Institute for Active
Transportation
Transit Plan
2017
Somerset
Complete Streets Policy
First countywide mobility manager hired
2018
Carroll Street
Road Safety Audit
Perry County Active
Transportation Plan
2019
2020
Perry County Transit
Installs bike hauling rack
2021
2022
Perry County Transit
Bike lending program expanded Countywide
2023
Buckeye Lake Trail
27-miles of wayfinding signs in 3 counties
2024
Regional Planning Efforts
In addition to local initiatives, several entities outside Perry County are working to improve active transportation options. Regional planning commissions supply data, assist with planning, and support funding applications. Perry County is within the jurisdiction of the Buckeye Hills Regional Council and the Mid-Ohio Regional Planning Commission (MORPC). The Buckeye Hills Regional Council coordinates transportation planning across eight counties in Southeast Ohio; it has representation on the Active Transportation Plan Advisory Team.MORPC offers technical assistance, crash data, and additional tools available for its member jurisdictions.
- Transportation System
- Traffic Volumes (Average Annual Daily Traffic)
84.4%
Perry County Commute Mode Share
10.9%
0.8%
1.6%
Sharrow on Tile Plant Road
Shoulder widths vary on state routes but are generally too narrow for bicycling
Sidewalk Summary
Corning – Sidewalks exist on portions of Main Street and Valley Street but are lacking on smaller residential streets.
Crooksville – Crooksville has a well-developed sidewalk network, centered along Main Street and State Street,and including Buckeye Street, Maple Avenue, Winter Street, and other residential streets.
Glenford – Isolated sidewalk segments exist on Mill Street, Main Street, and Broad Street. There are sidewalks on both sides of High Street from Main Street to Glenford Elementary School.
Hemlock – There are no sidewalks in Hemlock.
Junction City – Junction City has sidewalks along Main Street and parts of Logan Street, its primary arteries. Hill Street, Poplar Street, Elizabeth Street, and several other residential roads have partial sidewalks.
Somerset – In Somerset, the sidewalk network extends for several blocks from the town square at Main Street and Columbus Street, but is interrupted by frequent gaps beyond the central historic district. Low-density, outlying neighborhoods in Somerset do not feature sidewalks at all.
Sample walking conditions on Carroll Street in New Lexington
Sample walking conditions on Carroll Street in New Lexington
Sidewalk Summary, cont.
New Lexington – New Lexington has a large sidewalk network covering most neighborhoods and major roads. Carroll Street is an exception, which has no sidewalks north of East Broadway Street. There are frequent gaps in other parts of the network, with missing curb ramps and sections of sidewalk in disrepair. A streetscape project planned for the spring of 2020 will improve walking conditions along Main Street.
New Straitsville – SR 93 (Main and Clark Streets) in New Straitsville has sidewalks on at least one side of the street spanning almost the entire village. Beyond SR 93, there are no sidewalks within village limits.
Roseville – Main Street in Roseville has wide sidewalks on both sides in the center of town. Parts of 1st Street, Athens Road, and Zanesville Road have partial sidewalks.
Shawnee – Shawnee’s sidewalk network extends along parts of Main Street and several blocks on other local streets.
Thornville – Thornville has a well-developed sidewalk network, covering both sides of its main corridors (Main Street and Columbus Street), and many residential streets as well. However, sidewalks are lacking entirely in the northern part of town.
Newly installed ADA curb ramps in Somerset
Sample walking conditions in Crooksville
Perry County Transit vehicle
ATV campground in New Straitsville
ATV signage in New Straitsville
Perry County Crashes (2015-2019)
S o m e r s e t
C r o o k s v i l l e
J u n c t i o n Ci t y
S h a w n e e
R u r a l
N e w L e x i n g t o n
- Bicycle and Pedestrian Crashes
Bicycle art on SR 13 between Somerset and New Lexington
Recommendations
Recommendations (2024 Update)
Recommendations for this plan are divided into two categories: 1) infrastructure and 2) policy and programs. This chapter focuses primarily on infrastructure recommendations at countywide and local levels. Programs and policies that support active transportation are suggested at the end of the chapter. Recommendations were updated in 2024.
Infrastructure Recommendations
Infrastructure recommendations for this plan are divided into two parts based on geography and user type: regional routes focus on bicyclists, and local routes focus on pedestrians. Regional routes traverse the entire county, or large portions of it; they provide long-distance bicycle connections between communities and also facilitate local bicycle trips in communities along those routes. Local routes focus on improving pedestrian accommodations within communities, linking everyday destinations to residential neighborhoods. Bicycle recommendations are discussed first, followed by pedestrian recommendations.
Bicycle Facility Recommendations
Before detailing the specific recommendations to improve bicycling in Perry County, several elements of bikeway planning are described below. Completing each step in the planning process results in a more informed and nuanced set of recommendations for communities. It also ensures that this Plan adheres to national guidance on bikeway planning while recognizing and responding to the unique bicycling needs in Perry County’s small towns and rural areas.
Facility Toolkit
Countywide recommendations include three bicycle facility types to accommodate riders of varying ability and in different riding environments, shown in Table 1.
While there are many variations of bikeways, from standard bike lanes to trails, the three facility types described on the following pages are most appropriate for accommodating a broad range of bicyclists in rural areas.
Design Users
There are several important factors to consider during bicycle facility selection, but the final decision depends in large part on the types of bicyclists that are expected on a particular route. Understanding which types of bicyclists feel comfortable using a given facility is critical to building a safe, convenient, and well-used network. This section discusses the three types of bicyclists and how their confidence levels inform facility selection.
Understanding which types of bicyclists feel comfortable using a given facility is critical to building a safe, convenient, and well-used network.
Research shows that the provision of low-stress, connected bicycle networks improves bicyclist safety and encourages bicycling for a broader range of user types. The most common characteristics used to classify bicyclists are comfort level, bicycling skill and experience, age, and trip purpose. These characteristics can be used to develop generalized profiles of various bicycle users and trips, also known as “design users,” which inform bicycle facility design. However, people may not fit into a single user profile, and a bicyclist’s profile may change in a single day; for example, a commuter bicyclist who is comfortable bicycling within a bicycle lane when traveling alone may prefer to bicycle on a sidewalk or shared use path when traveling with children. The following sections examine how comfort, skill, and age may affect bicyclist behavior and preference for different types of bicycle facilities.
Selecting a design user profile is often the first step in assessing a street’s compatibility for bicycling. The design user profile should be used to select a preferred type of bikeway treatment for different contexts.
People who bicycle are influenced by their relative comfort operating with or near motor vehicle traffic. Many people are interested in bicycling for transportation, but are dissuaded by the potential for stressful interactions with motor vehicles. Of adults who have stated an interest in bicycling, research has identified three types of potential and existing bicyclists, 23 which are explained below and shown in Figure 1 and Figure 2. Children were not included in the research and require special consideration in the design of bicycle facilities.
Highly Confident Bicyclist
Highly Confident Bicyclists are the smallest group identified by research. While some of these individuals bicycle less frequently, when they do, they prefer direct routes and do not avoid operating in mixed traffic, even on roadways with higher motor vehicle operating speeds and volumes. Many also enjoy bikeways separated from traffic. Similarly, they may avoid bikeways which they perceive to be less safe, too crowded with pedestrians or other slower moving bicyclists, or require deviation from their preferred route.
Somewhat Confident Bicyclist
Somewhat Confident Bicyclists are the next-smallest group. They generally bicycle more than Highly Confident Bicyclists, and are comfortable on most types of bicycle facilities. They have a lower tolerance for traffic stress than the Highly Confident Bicyclist and generally prefer striped or separated bike lanes on major streets and low-volume residential streets, but they are willing to tolerate higher levels of traffic stress for short distances.
Interested but Concerned Bicyclist
Interested but Concerned Bicyclists are the largest group identified by the research and have the lowest tolerance for traffic stress. Bicycling by this group is suppressed in many communities, as those who fit into the group avoid bicycling except where they have access to networks of separated bikeways or very low-volume streets with safe roadway crossings. This group tends to bicycle for recreation but not transportation. To maximize the potential for bicycling as a viable transportation option, it is important to design bicycle facilities to meet the needs of the Interested but Concerned Bicyclist category. This is generally the recommended design user profile.
Network Rationale and Facility Selection Methodology
Bicycle networks should be continuous, connect seamlessly across jurisdictional boundaries, and provide access to destinations. Anywhere a person would want to drive to for utilitarian purposes, such as commuting or running errands, is a potential destination for bicycling. As such, planning connected low-stress bicycle networks is not achieved by simply avoiding motor vehicle traffic. Rather, planners should identify solutions for lowering stress along higher traffic corridors so that bicycling can be a viable transportation option for the majority of the population.
Various methodologies can be used to select the appropriate bicycle facility based on roadway width, traffic volumes, speeds, and other considerations. Bicycle facility selection methodology used in this plan relies on the forthcoming American Association of State Highway Transportation Officials Guide for the Development of Bicycle Facilities and a similar model used in the Iowa Department of Transportation’s Bicycle and Pedestrian Long-Range Plan; the latter focuses specifically on rural areas.
To select an appropriate facility based on traffic volume and speed, consult the figures below. These matrices include preferred and acceptable values for each facility type. Designers should utilize forecast traffic volumes if available. Additionally, designers should default to selecting the preferred facility when possible.
The typical bicyclist type on roadways in rural areas is the recreational bicyclist. Signed routes with shared lanes, paved shoulders, and shared use paths are appropriate bikeway types in rural areas. Shoulder width is an important consideration to accommodate these bicyclists based on traffic volumes and posted speeds in the rural context. It is often desirable to provide shared use paths along rural roads with higher speeds (45 miles per hour or greater). This is especially true for locations that attract larger volumes of recreational bicyclists or for routes that serve as key bicycle connections between destinations. Paths are also an important consideration for families and children making connections in rural areas. Shared use paths are also generally preferred on rural roads with Annual Average Daily Traffic above a certain threshold (e.g. above 6,000 or 7,000 AADT depending on context). In highly constrained conditions where sufficient shoulder width cannot be achieved, it is preferable to provide a narrow shoulder rather than no shoulder.
Urban areas in Perry County may experience a mix of recreational riders and utility riders: those making short trips around town for commuting, running errands, etc. These riders may be less confident than the typical recreational rider, and should be accommodated accordingly.
Countywide Bicycle Recommendations
Countywide bicycle recommendations include 80 miles of signed routes/shared roads, 90 miles of paved shoulders, and 40 miles of shared use paths, totaling 210 miles of proposed improvements. With the exception of a major north-south trail (the Emerald Necklace Greenway), countywide recommendations focus exclusively on bicycling. Walking trips are simply not feasible between most communities due to distance and terrain. Countywide recommendations are labeled RR for Regional Route in the following tables and maps. County routes consist of ten long-distance bicycle routes composed of 37 unique segments. Recommendation tables display detailed information on all proposed countywide routes by route segment, including location, extents (beginning and end points), facility type, project description, connections to other facilities, and priority. TMap IDs corresponds to the route labels in the maps. Due to their length, countywide recommendations are divided into segments, which also allows for a more nuanced prioritization approach (different segments of the same route can receive unique prioritization scores). The final column of the tables indicates which segments were selected as new priorities during the 2024 plan update.
The proposed 22-mile trail loop around Buckeye Lake is pictured on the recommendations maps, but is not included in the tables or total mileage of recommendations.
Countywide bicycle recommendations include 211 miles of proposed improvements.
Local Recommendations: Pedestrian Priority Areas
During a public workshop led by the Ohio Department of Health prior to the start of this planning process, participants identified a lack of pedestrian facilities in Perry County’s larger communities. Addressing these gaps is as an important focus of infrastructure recommendations. To respond to stakeholders’ priorities and ensure that this plan includes an equitable distribution of recommendations for both bicycle and pedestrian facilities, the project team developed a set of Pedestrian Priority Areas (PPA). PPAs are higher density settlements with compact built environments and many destinations within walking distance. They typically have some pedestrian accommodations in place, but existing infrastructure often suffers from disrepair, gaps, and lack of connectivity.
Perry County’s larger communities and certain travel corridors within these communities were identified for priority pedestrian improvements. The tables and maps in this section display detailed information on all proposed PPA projects, including location, extents, facility type, project description, connections to other facilities, and priority.
Facility Types
Pedestrian infrastructure is primarily provided in the form of sidewalks or multi-use trails. However, there are many unique treatments that can be implemented to improve the pedestrian experience, encourage more walking, and decrease the number of crashes that occur.
PPA recommendations include five treatment types to improve the walking environment in small town and rural contexts. These facility types are described in Table 3. Of particular note are sidewalks, the most common pedestrian facility type. The presence of sidewalks on both sides of the street corresponds to an approximately 88% reduction in “walking along road” pedestrian crashes.
Sixteen miles of pedestrian facilities are proposed for PPAs in Perry County, as well as 30 spot treatments, shown in the graphic below.
Pedestrian Improvements in Non-Priority Areas
The above recommendations would improve the walking environment in most of Perry County’s villages and larger communities. Walking is more likely to occur in these areas because many destinations are in close proximity. However, there are many smaller communities throughout the county where walking may occur, albeit at lower levels. Two Census-designated places and 21 unincorporated communities lay beyond village limits in Perry County. Generally, the focus of pedestrian transportation planning is decidedly urban, but it is important to consider pedestrian mobility in these isolated rural areas. Rural pedestrian travel constitutes a fraction of total pedestrian trips, but it still occurs in several ways:
- Walking for exercise – Rural roads are often the only place for rural residents to walk or jog.
- Short to moderate walks at the edge of communities – It is not uncommon for people to walk from just outside an urban area to a destination. For example, the New Lexington Kroger on Carroll Street is only half a mile from township residents on Tunnel Hill Road.
- Walking to rural destinations – Nearby gas stations, neighbors’ homes, places of employment, and rural schools are all destinations to which rural residents might walk rather than drive.
It is beyond the scope of this plan to provide detailed recommendations for every inhabited area throughout the county. The decision matrix on the following page provides guidance to smaller communities seeking to improve their walking environments. It considers several factors in determining the most appropriate pedestrian treatment: motor vehicle speeds, traffic volumes, right-of-way, and existing pedestrian facilities.
Programs and Policies
Establishing safe and convenient active transportation infrastructure is critical to improving walking and bicycling conditions throughout Perry County. But without programs and policies in place to support active transportation, infrastructure projects can only go so far. This section proposes several non-infrastructure recommendations to improve the regulatory and political environment for active transportation in Perry County.
Recommendations
Source: Bike Buckeye Lake
Shared Use Path
Paved Shoulder
Shared Road
Signed Route
- Bicycle Facility Types
*Due to constrained terrain and limited resources for implementation, certain proposed signed routes in Perry County exceed this threshold. In these cases, it is better to install signage as a short-term measure and consider long-term alternatives that offer more separation from motor vehicles, such as paved shoulders and shared use paths.
- Bicyclist confidence levels
Lower stress tolerance
Higher stress tolerance
4 - 7% Highly confident
5 - 9% Somewhat confident
51 - 56% Interested but Concerned
- Bicyclist facility preferences
MOST SEPARATED
LEAST SEPARATED
Buffered Bike Lane
Shared Use Path
Separated Bike Lane
Bike Lane
Shared Roadway
Shoulder Bikeway
- Rural Bicycle Facility Selection Matrix
(ODOT Multimodal Design Guide)
- Urban Bicycle Facility Selection Matrix
(ODOT Multimodal Design Guide)
Proposed Countywide Bicycle Network Improvements
Signed Route
Paved Shoulder
Shared Use Path
Miles
- Countywide Bicycle Recommendations (Regional Routes) - 2024 Updates
| Map ID | Segment ID | Location | Extents | Facility | Description | 2024 Priority |
|---|---|---|---|---|---|---|
| RR1 | 1A | SR 93 | Hocking County Line to New Straitsville | Signed Route | Signed route continues west on SR 93, connecting New Straitsville and Shawnee to Logan and SUSBR system on a low-volume signed route (maximum AADT in Perry County segment is 1,574). | |
| 1B | SR 93 | New Straitsville to Shawnee | Paved Shoulders | Short segment with paved shoulders connects New Straitsville and Shawnee via medium-volume signed route (maximum AADT 2,085). | Yes | |
| 1C | SR 93 | Shawnee to New Lexington | Paved Shoulders | Paved shoulders connect Shawnee to New Lexington via medium-volume signed route (maximum AADT 2,785). | Yes | |
| 1D | SR 13, Old Somerset Rd/SR 383, SR 13 | New Lexington to Somerset | Signed Route | Signed route connects New Lexington to Somerset via low-volume signed route (maximum AADT 753); provides low-stress alternative to SR 13. | ||
| 1D ALT | SR 13 | New Lexington to Somerset | Paved Shoulders | Potential long-term alternative to RR1D, paved shoulders on SR 13. | Yes | |
| 1E | SR 13, Rush Creek Rd, Zion Rd | Somerset to Thornville | Signed Route | Signed route connects Somerset to Thornville via low-volume signed route on local roads (maximum AADT 277); provides low-stress alternative to SR 13. | Yes | |
| 1E ALT | SR 13 | Somerset to Thornville | Paved Shoulders | Potential long-term alternative to RR1E, paved shoulders on SR 13. | Yes | |
| 1F | SR 204 | Thornville to Fairfield County Line | Signed Route | Signed route continues west on SR 204, connecting Thornville to Millersport in Fairfield County and SUSBR system on low-volume signed route (maximum AADT 1,260). Connects to existing Buckeye Lake network. | ||
| RR2 | 2A | Abandoned Rail Right-of-Way | Hocking to County Line New Straitsville | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. | |
| 2B | Abandoned Rail Right-of-Way | New Straitsville to Shawnee | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. Provides low-stress alternative to RR1B. | ||
| 2C | Abandoned Rail Right-of-Way | Shawnee to Junction City | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. Provides partial low-stress alternative to RR1C and RR4B. | Yes | |
| 2D | Abandoned Rail Right-of-Way | Junction City to Somerset | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. | Yes | |
| 2E | Abandoned Rail Right-of-Way | Somerset to Glenford | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. | ||
| Map ID | Segment ID | Location | Extents | Facility | Description | 2024 Priority |
| 2F | Abandoned Rail Right-of-Way | Glenford to Licking County Line | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. | ||
| RR3 | 3A | US 22 | Fairfield County Line to Somerset | Paved Shoulders | East-west route connects Somerset to Lancaster and SBR 65 in Fairfield County; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 2,468). | |
| 3B | US 22 | Somerset to Muskingum County Line | Paved Shoulders | East-west route connects Somerset to Muskingum County; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 3,279). | ||
| RR4 | 4A | SR 37 | Fairfield County Line to Junction City | Paved Shoulders | East-west route connects Junction City to Lancaster and SBR 65 in Fairfield County; widened shoulders accommodate bicyclists on medium-volume road (prevailing AADT 4,113). | |
| 4B | SR 37 | Junction City to New Lexington | Paved Shoulders | East-west route connects Junction City to New Lexington; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 4,185). | Yes | |
| 4C | SR 13/37/93 | New Lexington to Jamestown Rd | Paved Shoulders | East-west route connects New Lexington to eastern Perry County and Morgan County; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 4,437). | ||
| 4D | SR 13/37/93 | Jamestown Rd to Morgan County Line | Signed Route | East-west route connects New Lexington to eastern Perry County and Morgan County on medium-volume signed route (maximum AADT 2,057). | ||
| RR5 | 5A | SR 13 | Athens County Line to Rendville and Corning | Signed Route | Low-volume signed route connects southern Perry County to Athens County with potential connections to SBRs 20 and 65 (maximum AADT 1,804). | Yes |
| 5B | SR 13 | Rendville and Corning to Jamestown Rd | Signed Route | Medium-volume signed routes connects Rendville and Corning to RR6, continuing to New Lexington (maximum AADT 2,413). Partial long-term alternative: sidepath on abandoned rail right-of-way along SR 155 along SR 13 north of Rendville. | ||
| 5C | SR 13 | Jamestown Rd to SR 37 | Signed Route | Low-volume signed routes connects Rendville and Corning to RR4 and Crooksville (maximum AADT: 1,563). | ||
| 5D | SR 93/669 | SR 37 to Crooksville | Paved Shoulders | North-south route connects Crooksville to RR4; widened shoulders accommodate bicyclists on high volume road (maximum AADT 7,743). | ||
| 5E | SR 93 | Crooksville to Roseville | Paved Shoulders | North-south route connects Crooksville to Roseville; widened shoulders accommodate bicyclists on high volume road (maximum AADT 6,191). | ||
| 5D/E ALT | SR 93, Ceramic Rd | Crooksville to Roseville | Shared Use Path | Preferred long-term alternative: shared use path along SR 93 and Ceramic Rd through Crooksville, continuing onto Roseville. | ||
| Map ID | Segment ID | Location | Extents | Facility | Description | 2024 Priority |
| RR6 | RR6 | Jamestown Rd | SR 13/37/93 to SR 13 | Signed Route | Alternative route to RR4 and RR5, connecting New Lexington to Rendville and Corning via low-volume local road (maximum AADT 1,920). | |
| RR7 | RR7 | Marietta Rd | SR 93 to SR 13 | Signed Route | Minor connection on low volume route between RR1 and RR5 (maximum AADT 1,491). | |
| RR8 | 8A | SR 155 | Shawnee to Hemlock | Signed Route | Low-volume signed route connects Shawnee to Hemlock (maximum AADT 1,282). Long-term alternative: sidepath on abandoned rail right-of-way along SR 155. | |
| 8B | SR 155 | Hemlock to Corning | Signed Route | Low-volume signed route connects Hemlock to Corning (maximum AADT 1,282). Long-term alternative: sidepath on abandoned rail right-of-way along SR 155. | ||
| RR9 | 9A | SR 204 | Thornville to Glenford | Paved Shoulders | East-west route connects Thornville to Glenford; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 1,552). Preferred alternative: signed route (traffic volumes are only slightly above the threshold for warranting paved shoulders). | Yes |
| 9B | SR 204 | Glenford to US 22 | Signed Route | Route connects Glenford to US 22 and Northeastern Perry County. Signed route accommodates bicyclists on low-volume road (maximum AADT 1,143). | ||
| RR10 | 10A | SR 669, SR 345 | SR 13 to SRs 345/669 Intersection | Signed Route | East-west route connects Roseville and Crooksville to Somerset. Signed route accommodates bicyclists on low-volume road (prevailing AADT 1,279). Widened shoulders could be installed on the short segment on SR 345, where volumes reach 3,240. | |
| 10B | SR 345, Old Rainer Rd | SR 669 to Crooksville | Signed Route | East-west route connects Roseville to Somerset. Signed route accommodates bicyclists on low-volume road (prevailing AADT 287). | ||
| 10C | SR 669 | SRs 345/669 Intersection to Crooksville | Signed Route | East-west route connects Crooksville to Somerset. Signed route accommodates bicyclists on low-volume road (prevailing AADT 1,374). | ||
- Countywide Recommendations
41 | Perry County Active Transportation Plan
Proposed Pedestrian Priority Area Improvements
Gateway/Traffic Calming
8 Total
Crossing Treatment
21 Total
Yield Roadway
Sidewalk
Shared Use/Sidepath
| 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Miles
- Pedestrian Facility Types
| Shared Use or Sidepath | Sidewalk | Yield Roadway | |
|---|---|---|---|
| Description | Sidepaths are typically designed as two-way facilities physically separated from motor vehicle traffic and used by bicyclists, pedestrians, and other non-motorized users. They provide a low-stress and comfortable alternative to parallel roadways. They are used for recreational opportunities in addition to transportation. | Sidewalks are intended for exclusive use by pedestrians. They are adjacent to but separated from the roadway by a curb and/or buffer, such as a tree lawn. As roadway speeds and volumes increase, a greater degree of separation is needed to maintain a safe and comfortable walking environment for pedestrians. Sidewalks are common in urban areas but they may also be necessary in rural areas with pedestrian generators, such as schools and businesses. Sidewalks reduce “walking along roadway” crashes and may notably increase levels of walking in areas with high traffic speeds and/or volumes. | Yield roadways, also known as shared streets, accommodate pedestrians, bicyclists, and motor vehicles in slow-speed, low-volume shared travel areas. They are typically narrow (12 to 20 feet), unmarked, two-way streets found in residential neighborhoods, where most users are familiar with local road conditions. Paved or unpaved shoulders may be used by pedestrians, for motor vehicle parking, and as a yield zone to oncoming traffic. The lack of pavement markings creates an ambiguous travel environment, encouraging caution and slow operating speeds. |
| Intended Users | Bicyclists and Pedestrians | Pedestrians | Bicyclists, Pedestrians, and Motorists |
| Context | Urban and Rural | Urban | Small Town Rural |
| Posted Speed Limit | Urban: Any speed (typically 30 mph or higher)Rural: Any speed (typically 55 mph or higher) | 30 mph (preferred)50 mph (acceptable) | 20 mph (preferred)30 mph (acceptable) |
| Motor Vehicle Traffic Volume | Urban: Any volume (typically 15,000 ADT or greater)Rural: Any volume (typically 6,500 ADT or greater). | 12,000 ADT or lower (preferred) | 500 ADT or lower (preferred)2,000 ADT (acceptable) |
| Other Considerations | Sidepaths should be at least 10 feet wide (wider where higher bicycle and pedestrian traffic is expected, e.g., urban areas). Special consideration must be given to the design of roadway crossings to increase visibility, clearly indicate right-of-way, and reduce crashes. Alternative accommodations should be sought when there are many intersections and commercial driveway crossings per mile. | N/A | Roadways used by pedestrians must meet the same accessibility guidelines for walkways, as required by the Americans with Disabilities Act (ADA). Warning signs can be used to inform motorists that they may encounter pedestrians and/or bicyclists sharing the road. |
| Crossing Improvement | Gateway/Traffic Calming | |
|---|---|---|
| Description | A variety of solutions can be employed to make intersections safer and more convenient for people walking. These treatments range from painted facilities, such as high-visibility crosswalks, to lights and signals, such as rectangular rapid flashing beacons (RRFB). Painted crosswalks delineate the safest pathway for pedestrians and RRFBs enhance user safety and convenience at crossing points when full signalization is not warranted. | Signage, public art, and landscaping at entrances to communities, commercial areas, town centers, or busy places of activity are all used to alert motorists that they are entering special areas. In addition to their traffic calming and streetscape functions, gateways can showcase the history and unique qualities of communities. With strong community involvement, gateway projects can become highly effective placemaking tools and a key ingredient in revitalizing commercial districts. |
| Intended Users | Bicyclists and Pedestrians | N/A |
| Context | Urban and Rural | Small Town Rural |
| Posted Speed Limit* | Any Speed | Any Speed |
| Motor Vehicle Traffic Volume* | Any Volume | Any Volume |
| Other Considerations | N/A | N/A |
Source: Marion County Regional Planning Commission
Sidewalk
Crossing Treatment
Gateway/Traffic Calming
Shared Use or Sidepath
Sidewalk
Yield Roadway
Source: Alyson Fletcher
Source: Marion County Regional Planning Commission
Pedestrian Lane (see page 62 for more information.)
Crossing Treatment
Gateway/Traffic Calming
- Crooksville Recommendations - 2024 Update
| Map ID* | Location | Extents | Facility | Description | 2024 Priority |
|---|---|---|---|---|---|
| CV1 | Ceramic Way and SR 93 | Intersection | Crossing Improvement | Install high-visibility crosswalk and Rectangular Rapid Flashing Beacon to assist students crossing SR 93. | - |
| CV2 | Ceramic Way/SR 669 | SR 93 to Ceramic Rd | Sidewalk | Install sidewalk on north side of street to connect housing to village center and Crooksville Schools campus. | - |
| CV3 | Ceramic Rd | SR 669 to Corporation boundary | Sidewalk | Install sidewalk on west side of street to connect housing to village center and Crooksville Schools campus. | - |
| CV4 | S State St/Ceramic Rd | Corporation boundary to Amerine St | Sidewalk | Install sidewalk on west side of street to connect apartment complexes and single-family housing to village center. | - |
| CV5 | N State St | E Main St to Baker St | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. | - |
| CV6 | Ridge Ave | Bennet St to China St | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. | - |
| CV7 | Ridge Ave and SR 93 | Intersection | Crossing Improvement | Install high-visibility crosswalk and Rectangular Rapid Flashing Beacon to connect east and west sides of village. | - |
| CV8 | Walnut St | Short St to North St | Sidewalk | Fill in sidewalk gap. | - |
| CV9 | Walnut St | McKeever St to Vaughn St | Sidewalk | Fill in sidewalk gap. | - |
| CV10 | Industrial Dr | State St to Ceramic Rd | Shared Use Path | - |
*Map IDs corresponds to the recommendation labels in the maps. Abbreviations refer to the community in which the recommended project is located; for example, CV-1 denotes a project in Crooksville.
- Crooksville Recommendations* - 2024 Update
47 | Perry County Active Transportation Plan
- New Lexington Recommendations - 2024 Update
| Map ID | Location | Extents | Facility | Description | 2024 Priority |
|---|---|---|---|---|---|
| NL1 | W Brown St | Corporation Boundary to W Water St | Sidewalk | Fill in sidewalk gaps. (Note: Potential ROW concerns) | - |
| NL2 | Rush St | Corporation Boundary to W Brown St | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. | - |
| NL3 | Fowler St | Rush St to S State St | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. | - |
| NL4 | Church St, Fowlers Ln, and S Main St | Intersection | Crossing Improvement | Install pedestrian island, high-visibility crosswalks, and Rectangular Rapid Flashing Beacons to connect homes on west side of Main St to Jim Rockwell Stadium and Artheusa Springs Park. | Yes |
| NL5 | Fowlers Ln | S Main St to corporation boundary | Sidewalk | Install sidewalks on both sides of street to connect homes to destinations on Main St, Jim Rockwell Stadium, and Artheusa Springs Park. | Yes - Grant 2027 |
| NL6 | 3rd Ave/Maple Heights Rd | Fowlers Ln to 1st St | Sidewalk/Sidepath | Install sidewalk or sidepath on east side of street to connect homes to Jim Rockwell Stadium. (Note: Potential ROW concerns). | - |
| NL7 | Dallas Ave/Lovers Ln + County Village Road | Mill St to Tunnel Hill Rd | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. | Yes |
| NL8 | Lincoln Park Dr | Carroll St to Jadwin Dr | Sidewalk | Install sidewalks on both sides of street to connect New Lexington Village Apartments to Kroger, Perry County Health Department, and destinations on Carroll St. | Complete - 2024 |
| NL9 | Carroll St | Elizabeth St to Panther Dr NE | Sidewalk | Install sidewalks or sidepaths on both sides of street to serve destinations along Carroll St and connect to New Lexington Schools campus; install marked crossing with Rectangular Rapid Flashing Beacon at key locations; upgrade existing signalized crossings to high-visibility markings. Refer to the Priority Projects section in Chapter 5 for detailed recommendations. | Complete - 2026 |
| NL10 | Panther Dr NE | School entrance to Carroll St/SR 345 | Sidepath | Install sidepath on north side of street to connect New Lexington Schools campus to village. | Complete - 2024 |
| NL11 | Lincoln St | Carroll St to Clayton St | Yield Roadway/Bicycle Boulevard | Install share the road signage/bicycle boulevard pavement markings to alert motorists of people walking and bicycling along narrow roadway. Provides low-stress alternative route to Broadway St. | - |
| NL12a | W Broadway St | CVS Carrol St to Main St | Sidewalks | Install sidewalks on both sides of street for access to commercial destinations on Broadway. | Yes - ODOT TAP Grant 2027 |
| NL12b | W Broadway St | Main St to SR 13 | Sidewalks | Yes - ODOT TAP Grant 2027 | |
| Map ID | Location | Extents | Facility | Description | 2024 Priority |
| NL13 | SR 37/W Main St/Thorn St/W Broadway St | Perry County Fairgrounds main entrance to SR 13 | Sidepath | Install sidepath on south and west sides of street to connect fairgrounds to village. | Yes - 2029 |
| NL14 | W Broadway St, N Main St, and Monument St | Intersection | Crossing Improvement | Install high-visibility crosswalks along W Broadway St and across Monument Park to connect east and west sides of town. (Note: RR Crossing Exempted) | Yes |
| NL15 | N Main St at railroad crossing | Railroad crossing | Crossing Improvement | Extend sidewalk to railroad ROW on both sides of street; mark path delineation for pedestrians and bicyclists to safely navigate rail crossing. See ODOT guidance for "Selecting Supplemental Treatments and Traffic Control Devices for Pedestrian and Bicycle At-Grade Crossings of Rail Lines." (Note: RR Crossing Exempted) | Yes |
| NL16 | Union St and N Main St | Intersection | Crossing Improvement | Install high-visibility crosswalk and Rectangular Rapid Flashing Beacon to connect homes on west side of Main St to Save A Lot/Dollar General. (Note: RR Crossing Exempted) | Yes |
| NL17 | Water St and N Main St | Intersection | Crossing Improvement | Install Rectangular Rapid Flashing Beacon to connect destinations on both sides of Main St and alert motorists of pedestrian activity. (Note: RR Crossing Exempted) | - |
| NL18 | State St | South Main St to Tile Plant | Sidewalk | - | |
| NL19 | Main Street | Broadway to Save-a-Lot | Sidewalk | - | |
| NL20 | Tile Plant Road | Pleasant Street to Corporation Limit | Shared Use Path | - | |
| NL 21 | Mill Street | Main Street to Dallas Avenue | Sidewalk | The Streetscape Improvement Project aims to upgrade sidewalks, enhancing safety and ensuring compliance with ADA standards. | Yes |
- New Lexington Recommendations - 2024 Update
- New Straitsville Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PriorityNS1Main St & Martin StIntersectionCrossing ImprovementYesNS2Main St and Clark StIntersection Crossing ImprovementUpgrade standard crosswalks on all intersection legs to high-visibility markings.CompleteNS3Ewing St and Clark StIntersection Crossing ImprovementUpgrade standard crosswalks on all intersection legs to high-visibility markings.CompleteNS4Western Corporation Boundary on SR 93Corporation Boundaries on SR 93Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.-NS5Northern Corporation Boundary on SR 93Corporation Boundaries on SR 93Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.-NS6Western Corporation Boundary on SR 595Corporation Boundaries on SR 595Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.-NS7Eastern Corporation Boundary on SR 216Corporation Boundaries on SR 216Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.-NS8Main StLibraryCrossing Improvement-NS9Clark St & Front StNear Bus Stop shelterCrossing Improvement-
- New Straitsville Recommendations - 2024 Update
- Somerset Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PrioritySO1Main St/US 22 and Columbus St/SR 13 Intersection Crossing ImprovementUpgrade standard crosswalks on all intersection legs to high-visibility markings and add yield warnings (“shark teeth) and painted stop bars.YesSO2RR2D Shared Use Path Crossing at SR 13Trail CrossingCrossingInstall high-visibility crosswalk and Rectangular Rapid Flashing Beacon for trail users crossing SR 13. (Note: RR Underpass Needs Cleaning)-SO3Southern Corporation Boundary on SR 13Corporation Boundaries on SR 13Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.-SO4Eastern Corporation Boundary on US 22Corporation Boundaries on US 22Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.-SO5Northern Corporation Boundary on SR 13Corporation Boundaries on SR 13Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.-SO6Western Corporation Boundary on US 22Corporation Boundaries on US 22Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.-SO7Main St/Alley EntranceLibrary / Pharmacy IntersectionCrossing ImprovementYesSO8Main St/Family Dollar EntranceIntersectionCrossing ImprovementYesSO9Main St & North High StSchool IntersectionCrossing Improvement-SO10Market StMain St to Somerset ParkShared Use PathYes
- Somerset Recommendations - 2024 Update
- Corning Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PriorityCO1SR 13/Jefferson StreetCorporation BoundariesPaved ShoulderLong-term alternative to RR5A (signed route): paved shoulder through Corning, extending to Athens County Line (not pictured on map).-CO2Main St and Jefferson StIntersectionCrossing ImprovementYesCO3Main StChurch St to Harrison AveSidewalkYesCO4N Valley StMain St to Washington StSidewalkYesCO5N Valley St & Washington StIntersectionCrossing Improvement-
- Junction City Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PriorityJC1SR 37/Main StreetCorporation BoundariesSidewalk & StreetscapeFill in sidewalk gaps, widen sidewalks in commercial district, and add streetscape features (trees, street furniture, decorative lighting, etc.)YesJC2Junction City ParkComplete existing trail around parkShared Use PathYes
- Roseville Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PriorityRV1Zanesville Rd (west side)Main St to Maple St (Community Park)SidewalkInstall sidewalk on west side of street to connect north part of village to downtown.YesRV2Zanesville Rd & Maple StIntersectionCrossing Improvement-
- Shawnee Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PrioritySH1SR 93 and LaRue StreetIntersectionCrossing ImprovementInstall high-visibility crosswalk to connect Shawnee to Tecumseh Lake Trail.YesSH2Main StWest St to East StSidewalkYesSH3SR 93Main St to Tecumseh Lake ParkSidewalkYes
- Corning Recommendations - 2024 Update
- Junction City Recommendations - 2024 Update
- Roseville Recommendations - 2024 Update
58 | Perry County Active Transportation Plan
- Shawnee Recommendations - 2024 Update
59 | Perry County Active Transportation Plan
- Thornville/Thorn Township Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PriorityTV1Zion RdN West St to Town Hwy 1062/1099Sidepath Install sidepath on east side of street to connect Thornville to Thornport and Autumn at the Lake Rehabilitation and Nursing Center.YesTV2Zion RdTown Hwy 1062/1099 to SR 13SidepathInstall sidepath on east side of street to provide pedestrian and bicyclist accommodations through Thornport.YesTV3TR 358E Columbus St to TR 1061Shared Use PathYes - ODOT TAP Grant 2026
- Glenford Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PriorityGL1SR 204/High StMain St to TR 411Sidewalk-
- Hemlock Recommendations - 2024 Update
- Map IDLocationExtentsFacility Description2024 PriorityHE1SR 155 and Main StIntersectionPark Signage-
- Thornville and Thornport Recommendations- 2024 Update
- Glenford Recommendations- 2024 Update
- Hemlock Recommendations- 2024 Update
27,297
people live within
1 mile
of the proposed active transportation network
75%
of the county’s population
- Rural Pedestrian Facility Selection Matrix
Bicycle parking in Downtown Dayton
- Program and Policy Recommendations - 2024 Update
| Category | Recommendation | Lead Agency | 2024 Priority |
|---|---|---|---|
| Encouragement | Encourage communities to apply for bicycle friendly and walk friendly community status. | Perry County Health Department | |
| Encouragement | Encourage transit integration with bicycle and pedestrian networks. | Perry County Transit | |
| Encouragement | Encourage more people to walk and bicycle in conjunction with education efforts. | Perry County Health Department | Yes |
| Encouragement | Expand bicycle parking throughout the County. | Perry County Health Department, Local Governments | Yes |
| Encouragement | Add signage for “measured mile” walking paths in Crooksville Park, Glenford, Junction City (Main St), and Thornville. | Perry County Health Department | Yes |
| Enforcement | Incorporate bicycle safety-related education into training for new and experienced law enforcement officers. | Perry County Sheriff | |
| Enforcement | Develop a speed reduction program. | Perry County Sheriff | |
| Enforcement | Focus on positive reinforcement. | Perry County Sheriff | |
| Evaluation and Planning | Conduct regular bicycle and pedestrian counts. | Perry County Health Department | |
| Evaluation and Planning | Develop local walking plans for each community in Perry County. | Perry County Health Department | |
| Evaluation and Planning | Adopt a countywide Complete Streets policy. | Perry County Engineer | |
| Evaluation and Planning | Adopt a Vision Zero plan. | Perry County Health Department | Yes |
| Evaluation and Planning | Perform Regular Plan Updates. | Perry County Health Department | |
| Infrastructure | Expand Zero Loop transit stops and lines. | Perry County Transit | |
| Infrastructure | Add sidewalks leading from residential / commercial areas to grocery stores / gas stations. | Local Governments, Perry County Engineer | |
| Infrastructure | Incorporate Mountain Bike Trail in Perry State Forest connected to New Lexington + Somerset. | ODNR, ORCA, Perry County Engineer |
Implementation
This chapter describes the major factors involved in plan implementation. It defines the roles of key stakeholders, provides funding and maintenance strategies, and describes the process used to prioritize infrastructure recommendations. The implementation of this plan is a longterm investment in maintaining and expanding the use of active transportation in Perry County, and the steps below will serve as a guide to implementation leaders.
Roles and Responsibilities
A concerted effort in inter-jurisdictional collaboration is the first step towards successful implementation of the Perry County Active Transportation Plan. While the Perry County Health Department and Perry County Engineer should play leading roles during implementation, many other organizations must support this effort. Stakeholders identified in the list on this page will be collectively responsible for the design, funding, construction, maintenance, monitoring, and/or evaluation of the network.
The proposed network would add over 183 miles of improvements to ODOT-owned roads. This comprises the majority of the network. Cooperation Between ODOT and Perry County will be critical during plan implementation.
Funding Strategies
Active transportation projects comprise a fraction of overall transportation network construction and maintenance. While pedestrian and bicycle infrastructure generally does not serve as many users as highways, bridges, and other critical infrastructure, it can have a substantial positive effect on local economies. Additionally, providing opportunities for active living promotes public health and may reduce the burden on tax-payer funded healthcare systems over time. In this light, active transportation infrastructure is a critical component of a complete transportation network and results in a positive return on investment for communities that fund such projects. Several state and federal funding sources can be used to supplement local funding sources to build out the active transportation network and fund related programming efforts., as shown in Table 17.
Maintenance Strategies
The long-term performance of bicycle and pedestrian networks depends on both the construction of new facilities and an investment in continued maintenance. Maintaining bicycle and pedestrian facilities is critical to ensuring those facilities are accessible, safe, and functional. The two primary strategies in this section are focused on maintaining bicycle facilities located on ODOT-owned roads in Perry County. These strategies and actions are considered short term, with the goal of achieving them within five years. ODOT District 5 would be the lead party responsible for these strategies, with support from ODOT Central Office and local agencies. Additional maintenance recommendations are listed in Table 18.
Planning for Maintenance
Creating a strong maintenance program begins in the design phase. ODOT District 5, local public works departments, or other responsible agencies should be party to discussions about the placement of infrastructure and its design, as well as maintenance investment decisions. Maintenance staff should help identify typical maintenance issues, such as areas with poor drainage or frequent public complaints. They may have suggestions for design elements that can mitigate these issues or facilitate maintenance activities, and can provide estimates for ongoing maintenance costs for existing and proposed facilities.
Strategy 1: Clarify maintenance responsibilities for bicycle facilities within ODOT right-of-way
Action 1.1: Use maintenance agreements with local jurisdictions and partner agencies to identify responsibilities for maintenance activities.
The jurisdiction that owns the facility is generally responsible for maintenance and operations. However, a maintenance agreement can be used to assign maintenance responsibilities to another agency and specify reimbursement of maintenance costs. Without maintenance agreements, confusion over maintenance responsibilities can occur. Effective maintenance programs include coordination between the government agencies that own and maintain the infrastructure.
Maintenance agreements can transfer responsibility from ODOT to local agencies and can provide for payments to local agencies for performing maintenance responsibilities that ODOT maintenance operations would normally perform. For example, New Lexington may agree to conduct plowing, mowing, and other maintenance activities on its segment of RR1, the proposed signed route that spans the county from north to south, primarily using state routes.
Clarifying responsibilities for maintenance costs and operations ensures that maintenance problems can be directed to the responsible party and resolved in a timely manner to maintain safe facilities for users. Ideally, one agency would be responsible for the length of an individual facility. Facilities managed by a single entity are more likely to have a consistent level of maintenance that users come to expect.
Strategy 2: Develop a proactive pavement preservation program
Pavement Preservation and Repair
All types of bikeways and walkways will become damaged, worn, lifted, or cracked over time. Pavement preservation methods and repairs can help increase the lifespan of those facilities and delay the need for resurfacing or reconstruction. Many repairs will have an immediate beneficial impact on the safety of pedestrians and bicyclists by reducing hazards.
Sidewalks are the most common pedestrian facility and need on-going maintenance attention. Ignoring repairs will often result in tripping hazards for pedestrians. Short-term repair measures for concrete sidewalks include patching, grinding (or horizontal cutting), and wedges to temporarily deal with uneven sidewalk blocks. Mudjacking, or pumping dirt or filler below sunken sidewalk slabs, is also used to lift the pavement back to its original position. Grinding and horizontal cutting methods are becoming more common and used when upheaved sidewalk pieces are showing minor vertical displacements.
Maintenance measures for on-road bikeways are similar to those needed for roadway maintenance. These measures include patching, micro surfacing, crack sealing, and seal coating. On shared-use paths, it is especially important to cut back intrusive tree roots and install root barriers or root trenches where appropriate to prevent surface breakup.
Action 2.1: Conduct pavement preservation repairs to ODOT-owned bicycle facilities on an as-needed basis, including crack sealing, patching, fog sealing, microsurfacing, and asphalt resurfacing.
Many short- and mid-term maintenance techniques are used for pavement preservation. These include crack sealing, patching, fog sealing, microsurfacing, asphalt resurfacing, grinding and cutting, and tree root barriers. ODOT can perform minor repairs and maintenance activities for bikeway pavement preservation as needed. The need for repairs could be identified through various channels, such as requests from local agencies or public demand.
Action 2.2: Notify the responsible agency about maintenance issues on bicycle facilities.
Where an existing maintenance agreement identifies a local agency as the responsible entity, ODOT can inform that agency and offer support as it addresses the problem, if needed. Where no maintenance agreement is in place and the facility in need of maintenance is within a local jurisdiction’s boundaries, ODOT could inform the appropriate agency of the problem and request that it be addressed.
Project Prioritization and Implementation
The infrastructure recommendations in Chapter 4 are conceptual routes, meant to show the potential of a comprehensive active transportation system in Perry County. The recommendations are planning level in scope and are not necessarily constrained by existing challenges. Funding, land use, property rights, terrain, and other project specific factors may make certain recommendations less practicable than others. Project prioritization uses measurable data to determine which projects are both feasible, given real-world constraints, and align with stakeholders’ priorities.
As with most government agencies, Perry County has a limited amount of funding with which to build bicycle infrastructure. Because of this, it is imperative that the projects providing the most benefit be prioritized over others. In 2024, partners from each community contributed to identifying their priority projects for the coming years. This replaces the prioritization of projects as included in the 2019 plan. These high priority projects are listed in Table 19. Perry County should continue to celebrate successes and reevaluate priorities on a regular basis.
Network Buildout
This is Perry County’s first coordinated effort to institute a countywide bicycle and pedestrian network. With virtually no bicycle facilities throughout the county and a very limited sidewalk network, Perry County is building its active transportation system from the ground up. Because institutional knowledge about implementing active transportation facilities may be lacking, it is paramount that the Advisory Team and other implementation leaders consult best practices in building the network. Suggested resources are listed below, and common steps and considerations in implementing active transportation plans are listed in Table 20 by facility type.
- Multimodal Design Guide
- Ohio Manual of Uniform Traffic Control Devices (OMUTCD), Part 9: Traffic Controls for Bicycle Facilities
Other
- FHWA Small Town and Rural Design Guide
- FHWA Achieving Multimodal Networks: Applying Design Flexibility and Reducing Conflicts
- FHWA Bikeway Selection Guide
- AASHTO Guide for the Development of Bicycle Facilities, 5th Edition
Evaluating Performance
Measuring the performance of active transportation networks is essential to ongoing success. Bicycle and pedestrian counts, crash records, and other data contribute to a business case for continued improvement of and investment in multimodal infrastructure. As recommendations in the Plan are constructed and programs are started, implementation leaders must be able to measure whether these investments are paying active transportation dividends (i.e. more people walking and bicycling). An affirmative answer reinforces the Plan’s legitimacy, and provides evidence that future investments will also yield positive results. The performance measures in Table 20 provide a framework for how Perry County can begin charting its progress towards making walking and biking safe, connected and comfortable. The Advisory Team should establish baseline targets and revisit these metrics as new plans and priorities occur. Data on these measures should be documented and published for public review annually. While considering these measures is a good starting point, Perry County would need to commit more time to develop a robust performance measures program. This includes establishing baseline measurements, performance targets, data collection frequency, and data collection and analysis responsibility.
Primary Implementation Stakeholders
Buckeye Hills Regional Council
Buckeye Trail Association
Mid-Ohio Regional Planning Commission
ODOT Central Office
ODOT District 5
Perry County Commissioners
Perry County Engineer
Perry County Health Department
Perry County Job and Family Services/Perry County Transit
Perry County Park District
Village Hemlock
Village of Corning
Village of Crooksville
Village of Glenford
Village of Junction City
Village of New Lexington
Village of New Straitsville
Village of Rendville
Village of Roseville
Village of Shawnee
Village of Somerset
Village of Thornport
Village of Thornville
- Primary Active Transportation Funds in Ohio
| Funding Source | Distributed by | Eligible Project Examples | Eligible Project Sponsor |
|---|---|---|---|
| Transportation Alternatives | Metropolitan Planning Organization (if applicable), or Ohio Department of Transportation (ODOT) if not | Bicycle & pedestrian facilitiesSafe routes for non-driversConversion & use of abandoned railroad facilitiesOverlooks & viewing areas | Local governments |
| Safe Routes to School | ODOT | InfrastructureNon-Infrastructure School Travel Plan assistance | Local governments (infrastructure)Local governments, school or health district, or non-profit (non-infrastructure) |
| Highway Safety Improvement Program | ODOT (Coordinate with local ODOT District to submit a safety study) | SignalizationTurn lanesPavement markingsTraffic signalsPedestrian signals/crosswalksBike lanesRoad diets | Local governments |
| Recreational Trails Program | Ohio Department of Natural Resources (ODNR) | New recreational trail constructionTrail maintenance/restorationTrailside and trailhead facilitiesPurchase/lease of construction & maintenance equipmentAcquisition of easementsEducational programs | Local governmentsState and federal agenciesPark districtsConservancy districtsSoil and water conservation districtsNon-profits |
| Clean Ohio Trails Fund | ODNR | New trail constructionLand acquisition for a trailTrail planning/engineering and design (must include construction) | Local governmentsPark districtsConservancy districtsSoil and water conservation districtsNon-profits |
| Clean Ohio Green Space Conservation Program | Ohio Public Works Commission (OPWC) | Open space acquisition including easementsBike racksKiosks/SignsHiking/Biking trailsPedestrian bridgesBoardwalks | Local governmentsPark districtsConservancy districtsSoil and water conservation districtsNon-profits |
| Small City Program | ODOT | Pavement RehabilitationRoundaboutsSignalsRoad diets | 54 eligible small cities with populations of 5,000 to 24,999 that are not located within a Metropolitan Planning Organization’s boundaries. |
- Additional Maintenance Recommendations
| Maintenance Activity | Strategy | |
|---|---|---|
| S h a r e d U s e P a t h s | Concrete Pavement Preservation | Develop and implement a comprehensive pavement management system for Perry County’s shared use path network. |
| Snow and Ice Control | Design shared-use paths to accommodate existing maintenance vehicles. | |
| Drainage Design | Clear debris from all drainage devices to keep drainage features functioning as intended and minimize trail erosion and environmental damage. | |
| Check and repair any damage to trails due to drainage issues. | ||
| Sweeping | Implement a routine sweeping schedule to clear shared-use paths of debris. | |
| Provide trail etiquette guidance and trash receptacles to reduce the need for sweeping. | ||
| Vegetation Management | Implement a routine vegetation management schedule to ensure user safety. | |
| Trim or remove diseased and hazardous trees along trails. | ||
| Preserve and protect vegetation that is colorful and varied, screens adjacent land uses, provides wildlife habitats, and contains prairie, wetland and woodland remnants. | ||
| ADA Requirements | Conduct walk and bike audits to assess accessibility of new, proposed, and existing shared-use paths. | |
| Ensure that ADA compliance is incorporated into the design process for new facilities. | ||
| P a v e d S h o ul d e r s | Pavement Markings | Explore approaches to routinely inspect pavement markings for bicycle infrastructure and replace as needed. |
| Consider preformed thermoplastic or polymer tape on priority bikeways (identified in this Plan) adjacent to high-volume motor vehicle routes (preformed thermoplastic or polymer tape are more durable than paint and requires less maintenance). | ||
| Snow and Ice Control | Clear all signed or marked shoulder bicycle facilities after snowfall on all state-owned facilities that do not have a maintenance agreement with a local governmental unit in place. | |
| Sweeping | Implement a routine sweeping schedule to clear high-volume routes of debris. | |
| Signed Routes | Sign Replacement | Repair or replace damaged or missing signs as soon as possible. |
| S i d e w a l k s | Pavement Preservation and Repair | Conduct routine inspections of high-volume sidewalks and apply temporary measures to maintain functionality (patching, grinding, mudjacking). |
| Consider using public agency staff or hiring contractors for sidewalk repairs, rather than placing responsibility on property owner (property owner can still be financially responsible). | ||
| Snow and Ice Control | Educate the public about sidewalk snow clearance. | |
| Require sidewalk snow clearance to a width of five feet on all sidewalks. | ||
| Establish required timeframes for snow removal. | ||
| Implement snow and ice clearing assistance programs for select populations. | ||
- 2024 Priority Projects
| Map ID | Location | Extents | Facility Type |
|---|---|---|---|
| RR! - 1B | SR 93 | New Straitsville to Shawnee | Paved Shoulders |
| RR1 - 1C | SR 93 | Shawnee to New Lexington | Paved Shoulders |
| RR1 - 1D ALT | SR 13 | New Lexington to Somerset | Paved Shoulders |
| RR1 - 1E | SR 13, Rush Creek Rd, Zion Rd | Somerset to Thornville | Signed Route |
| RR1 - 1E ALT | SR 13 | Somerset to Thornville | Paved Shoulders |
| RR2 - 2C | Abandoned Rail Right-of-Way | Shawnee to Junction City | Shared Use Path |
| RR2 - 2D | Abandoned Rail Right-of-Way | Junction City to Somerset | Shared Use Path |
| RR4 - B | SR 37 | Junction City to New Lexington | Paved Shoulders |
| RR5 - 5A | SR 13 | Athens County Line to Rendville and Corning | Signed Route |
| NL4 | Church St, Fowlers Ln, and S Main St | Intersection | Crossing Improvement |
| NL5 | Fowlers Ln | S Main St to corporation boundary | Sidewalk |
| NL7 | Dallas Ave/Lovers Ln + County Village Road | Mill St to Tunnel Hill Rd | Yield Roadway |
| NL12a | W Broadway St | CVS Carrol St to Main St | Sidewalks |
| NL12b | W Broadway St | Main St to SR 13 | Sidewalks |
| NL13 | SR 37/W Main St/Thorn St/W Broadway St | Perry County Fairgrounds main entrance to SR 13 | Sidepath |
| NL14 | W Broadway St, N Main St, and Monument St | Intersection | Crossing Improvement |
| NL15 | N Main St at railroad crossing | Railroad crossing | Crossing Improvement |
| Map ID | Location | Extents | Facility Type |
| NL16 | Union St and N Main St | Intersection | Crossing Improvement |
| NS1 | Main St & Martin St | Intersection | Crossing Improvement |
| SO1 | Main St/US 22 and Columbus St/SR 13 | Intersection | Crossing Improvement |
| SO7 | Main St/Alley Entrance | Library / Pharmacy Intersection | Crossing Improvement |
| SO8 | Main St/Family Dollar Entrance | Intersection | Crossing Improvement |
| SO7 | Main St/Alley Entrance | Library / Pharmacy Intersection | Crossing Improvement |
| SO8 | Main St/Family Dollar Entrance | Intersection | Crossing Improvement |
| SO10 | Market St | Main St to Somerset Park | Shared Use Path |
| CO2 | Main St and Jefferson St | Intersection | Crossing Improvement |
| CO3 | Main St | Church St to Harrison Ave | Sidewalk |
| CO4 | N Valley St | Main St to Washington St | Sidewalk |
| JC1 | SR 37/Main Street | Corporation Boundaries | Sidewalk & Streetscape |
| JC2 | Junction City Park | Complete existing trail around park | Shared Use Path |
| RV1 | Zanesville Rd (west side) | Main St to Maple St (Community Park) | Sidewalk |
| SH1 | SR 93 and LaRue Street | Intersection | Crossing Improvement |
| SH2 | Main St | West St to East St | Sidewalk |
| SH3 | SR 93 | Main St to Tecumseh Lake Park | Sidewalk |
| TV1 | Zion Rd | N West St to Town Hwy 1062/1099 | Sidepath |
| TV2 | Zion Rd | Town Hwy 1062/1099 to SR 13 | Sidepath |
| TV3 | TR 358 | E Columbus St to TR 1061 | Shared Use Path |
- Network Buildout Considerations
| Implementation Activity | Strategy | |
|---|---|---|
| S h a r e d U s e P a t h s | Acquisition | Contact property owners to determine feasibility of acquiring abandoned rail right-of-way for shared use path development. |
| Funding | Work with partner agencies (e.g. park district) to identify potential funding streams for right-of-way acquisition, design, construction, and maintenance. | |
| Alternatives | When shared use paths are not feasible, other bikeways which maximize user safety and comfort to the greatest extent practicable should be considered. For example, if the preferred bikeway is a shared use path and the current project is a street resurfacing, it may not be feasible for that project to install the shared use path. The only practical option may be the installation of a shoulder. | |
| P a v e d S h o ul d e r s | Project Identification and Development | Review ODOT District 5 resurfacing schedule. Work with District staff to pursue widened shoulders on priority routes identified in this Plan; upcoming resurfacing projects that do not overlap with Plan recommendations could also be considered for widened shoulders on a case by case basis (if significant bicycle activity exists or has the potential to develop along the route). |
| Dimensional Considerations | On routes where widened paved shoulders are recommended in this Plan, determine if preferred shoulder widths (see Chapter 5) can be constructed within existing right-of-way. If not, widen shoulders as much as possible: in highly constrained conditions where sufficient shoulder width cannot be achieved, it is preferable to provide a narrow shoulder rather than no shoulder. | |
| Drainage | Drainage is a challenging factor in rural areas. The presence of drainage swales can make wider paved shoulders fiscally challenging and often requires additional right-of-way (to site a facility on the private property side of the drainage, or cover the drainage with the facility, forcing it to move further away from the road). | |
| Alternatives | A separated shared use pathway or sidepath is a suitable alternative to providing paved shoulders. | |
| Signed Routes | Directional Signage | Identify key decision points along priority signed routes for signage placement. For long segments where decision points (i.e. intersections) do not exist, plan for wayfinding/directional signs every 2,640 feet (0.5 mile). |
| Determine responsibility for signage installation on state routes in urban areas. | ||
| List distances to key destinations on wayfinding signage in urban areas; in rural areas, list distances to nearby villages. | ||
| Regulatory and Warning Signage | Install Bikes May Use Full Lane (BMUFL) signs at corporation limits to all villages (R4-11 Manual on Uniform Traffic Control Devices). Consider BMUFL signs on priority bikeways in unincorporated areas and install Share the Road signs on all bikeways in unincorporated areas (MUTCD W16-1P). | |
| Pavement Markings | Pavement markings, such as sharrows, in between sign locations can supplement signed routes to alert motorists and inform bicyclists that they are still on the correct route. | |
| S i d e w a l k s | Expand Sidewalk Networks | While new development is concentrated in only a few locations throughout the county, communities expecting growth should establish ordinances or amend subdivision regulations to require sidewalk installation for all new developments at the time of street construction. |
| Transition to 100% public funding for new sidewalks in high pedestrian infrastructure demand areas (e.g. Carroll Street). | ||
| Fill in Sidewalk Gaps | Require sidewalk installation for all redevelopment projects. | |
| Crossings | Require high-visibility, protected crossings in high priority areas (e.g. Carroll Street). | |
- Recommended Performance Measures
| Bicycle Facilities | Increase miles of network built annually – target __% increase per year. |
|---|---|
| Increase amount of bicycle parking facilities annually. | |
| Semi-Annual Pedestrian and Bicycle Counts | After developing a baseline of pedestrian and bicycle activity, aim for year over year increases. |
| Update student travel tallies for all schools and identify a baseline percentage of students who walk and bike. Conduct travel tallies semi-annually and measure the change in the number of students walking and bicycling. | |
| Education Programming | Track the number of children and adults who participate in pedestrian and bicycle education programming every year. |
| Track public education campaigns and programs that include targeted efforts for law enforcement, students, traditionally underserved populations and other key stakeholders with target outreach goals set for 2025 and 2030. | |
| Safety | Track the number of crashes that occurs every year, including whether bicyclists or pedestrians were involved and the level of severity, if injuries occurred. |
| Reduce rate of bicycle/pedestrian and motor vehicle crashes – target __% decrease per year. | |
| Public Opinion | Conduct an annual active transportation survey to gauge resident comfort and opinion about active transportation in Perry County. |
| Mode Share | Establish countywide bicycle and pedestrian mode share goals– set milestones for 2025 and 2030. (Current mode share is 1.6% for pedestrians and 0% for bicyclists.) |
| Increase bicycle and pedestrian mode share target __% per year. | |
Endnotes
- U.S. Department of Health and Human Services. 2008 PHYSICAL ACTIVITY GUIDELINES FOR AMERICANS. Washington, DC: U.S. Dept of Health and Human Services; 2008. http://health.gov/ paguidelines/pdf/paguide.pdf
- Kearns, K., Dee, A., Fitzgerald, A. P., Doherty, E., & Perry, I. J. (2014). Chronic disease burden associated with overweight and obesity in Ireland: the effects of a small BMI reduction at population level. BMC public health, 14, 143. doi:10.1186/1471-2458-14-143
- Gordon-Larsen, P., Boone-Heinonen, J., Sidney, S., et al. (2009). Active commuting and cardiovascular disease risk: the CARDIA study. Arch Intern Med 2009;169:1216–23. https://www.ncbi.nlm.nih.gov/pubmed/19597071
- “How to Increase Bicycling for Daily Travel,” Active Living Research, Research Brief, May 2013 http://activelivingresearch.org/ files/ALR_Brief_DailyBikeTravel_May2013.pdf
- de Hartog, J., Boogaard, H., Nijland, H., and Hoek, G. “Do the Health Benefits of Cycling Outweigh the Risks?” Environ Health Perspect. 2010 Aug; 118(8): 1109–1116. http://www.ncbi.nlm.nih.gov/pmc/ articles/PMC2920084/
- U.S. Department of Health and Human Services. 2008 PHYSICAL ACTIVITY GUIDELINES FOR AMERICANS. Washington, DC: U.S. Dept of Health and Human Services; 2008. http://health.gov/ paguidelines/pdf/paguide.pdf
- Centers for Disease Control and Prevention, Healthy Places, Mental Health http://www.cdc.gov/healthyplaces/healthtopics/ mental.htm. December 2012.
- Rails-to-Trails Conservancy. Investing in Trails Cost-Effective Improvements—for Everyone. https://www.railstotrails.org/resourcehandler.ashx?name=investing-in-trails-cost-effective-improvements-for-everyone&id=3629&fileName=Economic%20Impacts%20of%20Trails.pdf
- Camp, A. (2011). Trail Towns on Great Allegheny Passage Benefit from Visitor Spending. American Trails. https://www.americantrails.org/resources/trail-towns-on-great-allegheny-passage-benefit-from-visitor-spending
- Mid-Ohio Regional Planning Commission and the Central Ohio Greenways and Trails Group. (2015). The Impacts of Central Ohio Trails. http://www.morpc.org/wordpress/wp-content/uploads/2017/12/The-Impacts-of-Central-Ohio-Trails-_-Final-Report.pdf
- “The National Bicycling and Walking Study: 15–Year Status Report” May 2010 https://www.massdot.state.ma.us/portals/0/docs/ bike/15-year_report.pdf
- Willis, D., Manaugh, K., & El‐Geneidy, A. (2013). Uniquely satisfied: Exploring cyclists trip satisfaction. Transportation Research Part F: Traffic Psychology and Behaviour, 18, 136‐147. http://tram.mcgill.ca/Research/Publications/Cycling_Satisfaction_ TRB.pdf
- Cohen, L., Davis, R., Lee, V., and Valdovinos, E. (2010). “Addressing the Intersection: Preventing Violence and Promoting Healthy Eating and Active Living.” Prevention Institute, September 2010.
- NCHRP Report 770 “Estimating Bicycling and Walking for Planning and Project Development: A Guidebook” http://onlinepubs. trb.org/onlinepubs/nchrp/nchrp_rpt_770.pdf
- Federal Highway Administration, National Bicycling and Walking Study, “Case Study No. 15 The Environmental Benefits Of Bicycling And Walking,” 1993 http://safety.fhwa.dot.gov/ped_bike/docs/ case15.pdf
- McConnell, R. et al. (2010). ‘‘Childhood Incident Asthma and Traffic-Related Air Pollution at Home and School,’’ Environmental Health Perspectives 118 (July 2010): 1021–26, doi:10.1289/ ehp.0901232.
- Jerrett, M. (2009). et al., ‘‘A Cohort Study of Traffic-Related Air Pollution and Mortality in Toronto, Ontario, Canada,’’ Environmental Health Perspectives 117 (May 2009): 772–77, doi:10.1289/ ehp.11533.
- Parker, J. (2012). et al., Linkage of the 1999–2008 National Health and Nutrition Examination Surveys to Traffic Indicators From the National Highway Planning Network, National Health Statistics Report (U.S. Department of Health and Human Services, Apr. 2, 2012).
- Tian, N., Xue, J., and Barzyk, T. (2013). ‘‘Evaluating Socioeconomic and Racial Differences in Traffic Related Metrics in the United States Using a GIS Approach,’’ Journal of Exposure Science and Environmental Epidemiology 23 (Mar. 2013): 215–22, doi:10.1038/jes.2012.83.
- Rowangould, G. (2013). ‘‘A Census of the US near-Roadway Population: Public Health and Environmental Justice Considerations,’’ Transportation Research Part D Transport and Environment 25 (2013): 59–67, doi:10.1016/j.trd.2013.08.003
- Sarah Jarjour et al. (2013). ‘‘Cyclist Route Choice, Traffic-Related Air Pollution, and Lung Function: A Scripted Exposure Study,’’ Environmental Health 12 (Feb. 7, 2013): 14, doi:10.1186/1476- 069X-12-14.
- Doug Brugge et al. (2015). “Developing Community-Level Policy and Practice to Reduce Traffic-Related Air Pollution Exposure,” Environmental Justice (2015): Vol. 8, No. 3. DOI: 10.1089/ env.2015.0007
- Robert Wood Johnson Foundation. (2019). County Health Rankings and Roadmaps, Ohio Physical Inactivity. https://www.countyhealthrankings.org/app/ohio/2019/measure/factors/70/data
- Robert Wood Johnson Foundation. (2019). County Health Rankings and Roadmaps, Ohio Adult Obesity. https://www.countyhealthrankings.org/app/ohio/2019/measure/factors/11/map
- Dill, D. and N. McNeil. (2016). Revisiting the Four Types of Cyclists. In Transportation Research Record 2587. TRB, National Research Council, Washington, DC.
- Davis, W. J. (1995). Bicycle test route evaluation for urban road conditions. Presented at the Transportation Congress, ASCE, 1, 1063–1076.
- Sener, I. N., Eluru, N., & Bhat, C. R. (2009). An analysis of bicycle route choice preferences in Texas, US. Transportation, 36(5), 511–539. doi:10.1007/s11116-009-9201-4
- Wardman, M., Tight, M., & Page, M. (2007). Factors influencing the propensity to cycle to work. Transportation Research Part A: Policy and Practice, 41(4), 339–350.
- Sorton, A., & Walsh, T. (1994). Bicycle stress level as a tool to evaluate urban and suburban bicycle compatibility. Transportation Research Record (TRR), 1438, 17–24.
- Schultheiss, B., Goodman, D., Blackburn, L., Wood, A., Reed, D., and Elbech, M. (2019). Bikeway Selection Guide. Federal Highway Administation. https://safety.fhwa.dot.gov/ped_bike/tools_solve/docs/fhwasa18077.pdf
- Harrison, G. (2019). http://www.abandonedrails.com/Rock_Run_Branch
Appendix - 2019 Recommendations and Priorities
Elements from the 2019 plan that have been updated as of 2024 have been included in this appendix for reference.
- Countywide Bicycle Recommendations (Regional Routes)
| Map ID | Segment ID | Location | Extents | Facility | Description | Connections | Priority |
|---|---|---|---|---|---|---|---|
| RR1 | 1A | SR 93 | Hocking County Line to New Straitsville | Signed Route | Signed route continues west on SR 93, connecting New Straitsville and Shawnee to Logan and SUSBR system on a low-volume signed route (maximum AADT in Perry County segment is 1,574). | 1B | 3 |
| 1B | SR 93 | New Straitsville to Shawnee | Paved Shoulders | Short segment with paved shoulders connects New Straitsville and Shawnee via medium-volume signed route (maximum AADT 2,085). | 1A, 1C, 2B, 8A | 13 | |
| 1C | SR 93 | Shawnee to New Lexington | Paved Shoulders | Paved shoulders connect Shawnee to New Lexington via medium-volume signed route (maximum AADT 2,785). | 1B, 2B, 2C, 4B, 4C, 8A, RR7 | 6 | |
| 1D | SR 13, Old Somerset Rd/SR 383, SR 13 | New Lexington to Somerset | Signed Route | Signed route connects New Lexington to Somerset via low-volume signed route (maximum AADT 753); provides low-stress alternative to SR 13. | 1E, 2D, 2E, 3A, 3B, 4B | 24 | |
| 1D ALT | SR 13 | New Lexington to Somerset | Paved Shoulders | Potential long-term alternative to RR1D, paved shoulders on SR 13. | 10A, 1D | 26 | |
| 1E | SR 13, Rush Creek Rd, Zion Rd | Somerset to Thornville | Signed Route | Signed route connects Somerset to Thornville via low-volume signed route on local roads (maximum AADT 277); provides low-stress alternative to SR 13. | 1D, 1F, 3A, 3B, 9A | 11 | |
| 1E ALT | SR 13 | Somerset to Thornville | Paved Shoulders | Potential long-term alternative to RR1E, paved shoulders on SR 13. | 1E | 4 | |
| 1F | SR 204 | Thornville to Fairfield County Line | Signed Route | Signed route continues west on SR 204, connecting Thornville to Millersport in Fairfield County and SUSBR system on low-volume signed route (maximum AADT 1,260). Connects to existing Buckeye Lake network. | 1E, 9A | 15 | |
| RR2 | 2A | Abandoned Rail Right-of-Way | Hocking to County Line New Straitsville | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. | 2B | 30 |
| 2B | Abandoned Rail Right-of-Way | New Straitsville to Shawnee | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. Provides low-stress alternative to RR1B. | 1B, 1C, 2A, 2C | 31 | |
| 2C | Abandoned Rail Right-of-Way | Shawnee to Junction City | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. Provides partial low-stress alternative to RR1C and RR4B. | 1C, 2B, 2D | 21 | |
| Map ID | Segment ID | Location | Extents | Facility | Description | Connections | Priority |
| 2D | Abandoned Rail Right-of-Way | Junction City to Somerset | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. | 1D, 2C, 2E, 4A | 37 | |
| 2E | Abandoned Rail Right-of-Way | Somerset to Glenford | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. | 1D, 2D, 3B, 9A, 9B | 36 | |
| 2F | Abandoned Rail Right-of-Way | Glenford to Licking County Line | Shared Use Path | Shared Use Path (Emerald Necklace Greenway) attracts recreational users and long distance commuters traveling north-south through Perry County. | 2E | 32 | |
| RR3 | 3A | US 22 | Fairfield County Line to Somerset | Paved Shoulders | East-west route connects Somerset to Lancaster and SBR 65 in Fairfield County; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 2,468). | 1D, 1E, 2D, 3B | 9 |
| 3B | US 22 | Somerset to Muskingum County Line | Paved Shoulders | East-west route connects Somerset to Muskingum County; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 3,279). | 1D, 1E, 2E, 3A, 9B | 14 | |
| RR4 | 4A | SR 37 | Fairfield County Line to Junction City | Paved Shoulders | East-west route connects Junction City to Lancaster and SBR 65 in Fairfield County; widened shoulders accommodate bicyclists on medium-volume road (prevailing AADT 4,113). | 2D, 4B | 7 |
| 4B | SR 37 | Junction City to New Lexington | Paved Shoulders | East-west route connects Junction City to New Lexington; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 4,185). | 1C, 1D, 4A | 8 | |
| 4C | SR 13/37/93 | New Lexington to Jamestown Rd | Paved Shoulders | East-west route connects New Lexington to eastern Perry County and Morgan County; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 4,437). | 1C, 4D, RR6 | 2 | |
| 4D | SR 13/37/93 | Jamestown Rd to Morgan County Line | Signed Route | East-west route connects New Lexington to eastern Perry County and Morgan County on medium-volume signed route (maximum AADT 2,057). | 4C, 5C, 5D, RR6 | 12 | |
| RR5 | 5A | SR 13 | Athens County Line to Rendville and Corning | Signed Route | Low-volume signed route connects southern Perry County to Athens County with potential connections to SBRs 20 and 65 (maximum AADT 1,804). | 5B, 8B | 10 |
| 5B | SR 13 | Rendville and Corning to Jamestown Rd | Signed Route | Medium-volume signed routes connects Rendville and Corning to RR6, continuing to New Lexington (maximum AADT 2,413). Partial long-term alternative: sidepath on abandoned rail right-of-way along SR 155 along SR 13 north of Rendville. | 5A, 5C, 8B, RR6, RR7 | 29 | |
| 5C | SR 13 | Jamestown Rd to SR 37 | Signed Route | Low-volume signed routes connects Rendville and Corning to RR4 and Crooksville (maximum AADT: 1,563). | 4D, 5B, 5D, RR6 | 28 | |
| Map ID | Segment ID | Location | Extents | Facility | Description | Connections | Priority |
| 5D | SR 93/669 | SR 37 to Crooksville | Paved Shoulders | North-south route connects Crooksville to RR4; widened shoulders accommodate bicyclists on high volume road (maximum AADT 7,743). | 4D, 5C, 5E | 27 | |
| 5E | SR 93 | Crooksville to Roseville | Paved Shoulders | North-south route connects Crooksville to Roseville; widened shoulders accommodate bicyclists on high volume road (maximum AADT 6,191). | 10B, 5D | 5 | |
| 5D/E ALT | SR 93, Ceramic Rd | Crooksville to Roseville | Shared Use Path | Preferred long-term alternative: shared use path along SR 93 and Ceramic Rd through Crooksville, continuing onto Roseville. | 10B | 33 | |
| RR6 | RR6 | Jamestown Rd | SR 13/37/93 to SR 13 | Signed Route | Alternative route to RR4 and RR5, connecting New Lexington to Rendville and Corning via low-volume local road (maximum AADT 1,920). | 4C, 4D, 5B, 5C | 35 |
| RR7 | RR7 | Marietta Rd | SR 93 to SR 13 | Signed Route | Minor connection on low volume route between RR1 and RR5 (maximum AADT 1,491). | 1C, 5B | 23 |
| RR8 | 8A | SR 155 | Shawnee to Hemlock | Signed Route | Low-volume signed route connects Shawnee to Hemlock (maximum AADT 1,282). Long-term alternative: sidepath on abandoned rail right-of-way along SR 155. | 1B, 1C, 8B | 16 |
| 8B | SR 155 | Hemlock to Corning | Signed Route | Low-volume signed route connects Hemlock to Corning (maximum AADT 1,282). Long-term alternative: sidepath on abandoned rail right-of-way along SR 155. | 5A, 5B, 8A | 20 | |
| RR9 | 9A | SR 204 | Thornville to Glenford | Paved Shoulders | East-west route connects Thornville to Glenford; widened shoulders accommodate bicyclists on medium-volume road (maximum AADT 1,552). Preferred alternative: signed route (traffic volumes are only slightly above the threshold for warranting paved shoulders). | 1E, 1F, 2E, 9B | 19 |
| 9B | SR 204 | Glenford to US 22 | Signed Route | Route connects Glenford to US 22 and Northeastern Perry County. Signed route accommodates bicyclists on low-volume road (maximum AADT 1,143). | 2E, 3B, 9A | 18 | |
| RR10 | 10A | SR 669, SR 345 | SR 13 to SRs 345/669 Intersection | Signed Route | East-west route connects Roseville and Crooksville to Somerset. Signed route accommodates bicyclists on low-volume road (prevailing AADT 1,279). Widened shoulders could be installed on the short segment on SR 345, where volumes reach 3,240. | 1D ALT, 10B, 10C | 34 |
| 10B | SR 345, Old Rainer Rd | SR 669 to Crooksville | Signed Route | East-west route connects Roseville to Somerset. Signed route accommodates bicyclists on low-volume road (prevailing AADT 287). | 10A, 10C, 5E | 22 | |
| 10C | SR 669 | SRs 345/669 Intersection to Crooksville | Signed Route | East-west route connects Crooksville to Somerset. Signed route accommodates bicyclists on low-volume road (prevailing AADT 1,374). | 10A, 10B | 25 |
- Countywide Recommendations*
| Proposed Regional Routes | |
| Signed Route | |
|---|---|
| Paved Shoulder | |
| Shared Use Path | |
| Alternative Route | |
| Other Features | |
| State Bicycle Route | |
| Road | |
| Village | |
| Park/Open Space | |
| Water Body | |
RR1 ALT
RR5 ALT
RR1 ALT
*The Countywide Map shows the entire network on a large scale. To find a specific route segment, refer to Maps 7, 8, and 9.
83 | Perry County Active Transportation Plan
- Southern Perry County Recommendations*
| Proposed Regional Routes | |
| Signed Route | |
|---|---|
| Paved Shoulder | |
| Shared Use Path | |
| Alternative Route | |
| Other Features | |
| State Bicycle Route | |
| Road | |
| Village | |
| Park/Open Space | |
RR4D
RR5C
RR5B
RR2B
RR8B
RR1A
*Route segment numbering goes west to east or south to north. For example, RR1A travels through New Straitsville; RR1 continues north, terminating as RR1F through Thornville).
RR5A
RR2A
- Central Perry County Recommendations
| Proposed Regional Routes | |
| Signed Route | |
|---|---|
| Paved Shoulder | |
| Shared Use Path | |
| Alternative Route | |
| Other Features | |
| State Bicycle Route | |
| Road | |
| Village | |
| Park/Open Space | |
RR9B
RR10B
RR10A
RR1D ALT
RR10C
RR4D
RR5C
- Northern Perry County Recommendations
| Proposed Regional Routes | |
| Signed Route | |
|---|---|
| Paved Shoulder | |
| Shared Use Path | |
| Alternative Route | |
| Other Features | |
| State Bicycle Route | |
| Road | |
| Village | |
| Park/Open Space | |
| Water Body | |
RR2F
RR1F
RR9B
RR10A
Local Recommendations: Pedestrian Priority Areas
During a public workshop led by the Ohio Department of Health prior to the start of this planning process, participants identified a lack of pedestrian facilities in Perry County’s larger communities. Addressing these gaps is as an important focus of infrastructure recommendations. To respond to stakeholders’ priorities and ensure that this plan includes an equitable distribution of recommendations for both bicycle and pedestrian facilities, the project team developed a set of Pedestrian Priority Areas (PPA). PPAs are higher density settlements with compact built environments and many destinations within walking distance. They typically have some pedestrian accommodations in place, but existing infrastructure often suffers from disrepair, gaps, and lack of connectivity.
Perry County’s larger communities and certain travel corridors within these communities were identified for priority pedestrian improvements. The tables and maps in this section display detailed information on all proposed PPA projects, including location, extents, facility type, project description, connections to other facilities, and priority.
Facility Types
Pedestrian infrastructure is primarily provided in the form of sidewalks or multi-use trails. However, there are many unique treatments that can be implemented to improve the pedestrian experience, encourage more walking, and decrease the number of crashes that occur.
PPA recommendations include five treatments to improve the walking environment in small town and rural contexts. These facility types are described in Table 3. Of particular note are sidewalks, the most common pedestrian facility type. The presence of sidewalks on both sides of the street corresponds to an approximately 88% reduction in “walking along road” pedestrian crashes.
Nine miles of pedestrian facilities are proposed for PPAs in Perry County, as well as 20 spot treatments, shown in the graphic below.
Programs and Policies
Establishing safe and convenient active transportation infrastructure is critical to improving walking and bicycling conditions throughout Perry County. But without programs and policies in place to support active transportation, infrastructure projects can only go so far. This section proposes several non-infrastructure recommendations to improve the regulatory and political environment for active transportation in Perry County.
Encouragement
Encourage communities to apply for bicycle friendly and walk friendly community status.
The League of American Bicyclists’ Bicycle Friendly Community program provides a roadmap to enhance conditions for bicycling, ranking applicant communities on their level of “bicycle friendliness” on a scale from “Honorable Mention” through “Platinum.” The application process will help communities recognize their strengths and weaknesses regarding bicycling, and the response from the League of American Bicyclists will help guide each community in improving bicycling.
The Pedestrian and Bicycle Information Center (PBIC) awards communities that improve and prioritize pedestrian safety, access, mobility, and comfort with either a bronze, silver, or gold designation. PBIC, which is a partnership between the Federal Highway Administration and the University of North Carolina, provides a community assessment tool to evaluate existing pedestrian conditions and programs largely based on “4 E’s”—education, encouragement, engineering, and enforcement.
The Perry County Health Department should encourage local communities to work toward and apply for both awards. These agencies should also provide support for communities that wish to apply by reviewing applications and providing suggestions for improvements.
Encourage transit integration with bicycle and pedestrian networks.
Lead Agency: Perry County Job and Family Services/Perry County Transit
Connected bicycle and pedestrian networks increase the reach of transit systems by expanding the number of accessible destinations. Perry County Transit should continue to work toward providing bike racks on all transit vehicles in the near future. This is a relatively inexpensive action that can provide significant benefit to people without motor vehicles. Perry County Transit began installing bike racks on its vehicles in 2019.
Encourage more people to walk and bicycle in conjunction with education efforts.
The adage of “knowledge is power” is true for bicycling and walking. When people receive training on how to safely bicycle and walk while interacting with other users, they become empowered and encouraged to use active transportation regularly. The design of online and print safety and how-to materials, training courses, maps, and other education efforts should consider the need for encouragement and espouse the health, safety, environmental, and economic benefits of bicycling and walking discussed in Chapter 1. Ready-made materials are available through existing programs, such as ODOT’s Your Move campaign.
Expand bicycle parking.
Lead Agencies: Perry County Health Department, Local Governments
Secure and convenient bicycle parking is lacking in most communities throughout the county. Local agencies could takes requests for bicycle parking locations and work with adjacent property owners to install new parking. Depending on available funding, local agencies could pay for racks or share the cost with business owners. Local communities could develop unique “U-rack” designs to help brand bicycle parking in their communities. The Downtown Dayton Partnership installed almost 100 branded bike racks throughout Downtown.
Enforcement
Incorporate bicycle safety-related education into training for new and experienced law enforcement officers.
Lead Agency: Perry County SheriffSupporting Agencies: Local Law Enforcement
Bicycle-related training for law enforcement officers equips officers with the skills and knowledge to enforce the law on bikes. However, this training usually does not include content regarding traffic interactions between motorists, bicyclists, and pedestrians. Law enforcement officers are not always aware of the types of traffic violations that are most likely to result in crashes between bicyclists and motorists.
Brief education courses for local law enforcement officials can provide information about these topics and potentially count toward continuing education requirements that many officers are required to pursue. In addition, annual reviews of bicycle and pedestrian crash statistics and reports will provide law enforcement agencies with knowledge of the specific behavioral issues and high-risk crash locations within Perry County. Furthermore, law enforcement officers should consider seeking League of American Bicyclists Cycling Instructor certification, which will allow them to effectively teach bicycle safety and skills courses to other officers and the general public.
Develop a speed reduction program.
Lead Agencies: Perry County SheriffSupporting Agencies: Local Law Enforcement
Speed reduction programs strengthen enforcement and assure that vehicle speeds are safe for vulnerable users such as bicyclists and pedestrians. A comprehensive speed reduction program may include speed feedback trailers along key corridors where crashes or frequent speeding occur.
Focus on positive reinforcement.
Lead Agencies: Perry County Sheriff Supporting Agencies: Local Law Enforcement
Positive reinforcement includes recognition for safe and slow driving, yielding to pedestrians, bicyclists who signal their turns, and pedestrians looking both ways before crossing the street. Police in some communities hand out coupons for free coffee or other incentives to people who are observed practicing safe behavior.
Evaluation and Planning
Measuring the performance of active transportation networks is essential. Bicycle and pedestrian counts, crash records, and other data contribute to a business case for continued investment in multimodal infrastructure.
Conduct regular bicycle and pedestrian counts.
Lead Agency: Perry County Health DepartmentSupporting Agencies: MORPC, Buckeye Hills Regional Council, ODOT
To determine how many people are walking and bicycling every day in Perry County, local agencies should conduct several days of bicycle and pedestrian counts every year. This program would help identify popular active transportation corridors and how levels of walking and bicycling change over time. Perry County Health Department, Buckeye Hills Regional Council, and the Mid-Ohio Regional Planning Commission should coordinate this effort across the county to ensure consistent data collection. Data should be corroborated with third party data sources, such as Street Light (available to all public agencies in Ohio through ODOT).
Count locations should include a mix of rural and urban locations, key infrastructure such as bridges or trails, and locations for which data already exist.
The UCLA Bike Count Data Clearinghouse has resources for starting a count program: www.bikecounts.luskin.ucla.edu.
Develop local walking plans for each community in Perry County.
Lead Agency: Perry County Health DepartmentSupporting Agencies: Local Governments
Formalizing a village’s walking network will help to identify gaps, maintenance issues, and opportunities for improvement. Local walking plans should build upon the recommendations suggested for Pedestrian Priority Areas and the pedestrian infrastructure decision matrix for non-PPA communities in this Plan.
Adopt a countywide Complete Streets policy.
Lead Agency: Perry County EngineerSupporting Agency: Perry County Health Department
Perry County Commissioners should consider adopting a countywide Complete Streets policy. The Village of Somerset already has a policy in place; elevating this effort to the regional level would ensure consistent accommodations for people walking and bicycling throughout Perry County.
Adopt a Vision Zero plan.
Lead Agency: Perry County Health DepartmentSupporting Agencies: Perry County Engineer, Perry County Sheriff, Local Law Enforcement
Vision Zero is a policy that strives for zero fatalities or serious injuries on our roads each year. All aspects of a jurisdiction’s decision-making revolve around achieving this goal systematically, from infrastructure design to enforcement approaches to motorist education.
Vision Zero is about creating an environment where deaths and injuries are not avoided by sheer luck, but because proactive street design prevents them from happening by keeping speeds low, improving visibility, and encouraging a culture of safe and law-abiding road users.
In small towns and rural areas where fatalities may not be a regular occurrence, local agencies can still employ Vision Zero to further existing goals, such as revitalizing downtowns, attracting or retaining young professionals, and encouraging tourism through safer, more livable streets.
Perform Regular Plan Updates.
Revisiting and updating this Plan on a regular basis will maintain momentum for active transportation in Perry County. As funding, political, and community circumstances evolve, updating the Plan to reflect such changes will ensure its continued relevance. Updates every four to six years should achieve this goal.
Proposed Pedestrian Priority Area Improvements
Gateway/Traffic Calming
8 Total
Crossing Treatment
12 Total
Yield Roadway
Sidewalk
Sidepath
Miles
- Crooksville Recommendations
| Map ID* | Location | Extents | Facility | Description |
|---|---|---|---|---|
| CV1 | Ceramic Way and SR 93 | Intersection | Crossing Improvement | Install high-visibility crosswalk and Rectangular Rapid Flashing Beacon to assist students crossing SR 93. |
| CV2 | Ceramic Way/SR 669 | SR 93 to Ceramic Rd | Sidewalk | Install sidewalk on north side of street to connect housing to village center and Crooksville Schools campus. |
| CV3 | Ceramic Rd | SR 669 to Corporation boundary | Sidewalk | Install sidewalk on west side of street to connect housing to village center and Crooksville Schools campus. |
| CV4 | S State St/Ceramic Rd | Corporation boundary to Amerine St | Sidewalk | Install sidewalk on west side of street to connect apartment complexes and single-family housing to village center. |
| CV5 | N State St | E Main St to Baker St | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. |
| CV6 | Ridge Ave | Bennet St to China St | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. |
| CV7 | Ridge Ave and SR 93 | Intersection | Crossing Improvement | Install high-visibility crosswalk and Rectangular Rapid Flashing Beacon to connect east and west sides of village. |
| CV8 | Walnut St | Short St to North St | Sidewalk | Fill in sidewalk gap. |
| CV9 | Walnut St | McKeever St to Vaughn St | Sidewalk | Fill in sidewalk gap. |
*Map IDs corresponds to the recommendation labels in the maps. Abbreviations refer to the community in which the recommended project is located; for example, CV-1 denotes a project in Crooksville.
- Crooksville Recommendations*
| Pedestrian Priority AreaRecommendations | |
| Yield Roadway | |
|---|---|
| Sidewalk | |
| Crossing Improvement | |
| Regional Routes | |
| Signed Route | |
| Paved Shoulder | |
| Shared Use Path | |
| Other Features | |
| Road | |
| Village | |
| Park/Open Space | |
RR10C
CV8 & 9
*Regional routes are pictured on local recommendations maps to show how they connect to local networks.
- New Lexington Recommendations
| Map ID | Location | Extents | Facility | Description |
|---|---|---|---|---|
| NL1 | W Brown St | Corporation Boundary to W Water St | Sidewalk | Fill in sidewalk gaps. |
| NL2 | Rush St | Corporation Boundary to W Brown St | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. |
| NL3 | Fowler St | Rush St to S State St | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. |
| NL4 | Church St, Fowlers Ln, and S Main St | Intersection | Crossing Improvement | Install pedestrian island, high-visibility crosswalks, and Rectangular Rapid Flashing Beacons to connect homes on west side of Main St to Jim Rockwell Stadium and Artheusa Springs Park. |
| NL5 | Fowlers Ln | S Main St to corporation boundary | Sidewalk | Install sidewalks on both sides of street to connect homes to destinations on Main St, Jim Rockwell Stadium, and Artheusa Springs Park. |
| NL6 | 3rd Ave/Maple Heights Rd | Fowlers Ln to 1st St | Sidewalk/Sidepath | Install sidewalk or sidepath on east side of street to connect homes to Jim Rockwell Stadium. |
| NL7 | Dallas Ave/Lovers Ln | Mill St to Tunnel Hill Rd | Yield Roadway | Install share the road signage to alert motorists of people walking and bicycling along narrow roadway. |
| NL8 | Lincoln Park Dr | Carroll St to Jadwin Dr | Sidewalk | Install sidewalks on both sides of street to connect New Lexington Village Apartments to Kroger, Perry County Health Department, and destinations on Carroll St. |
| NL9 | Carroll St | Elizabeth St to Panther Dr NE | Sidewalk | Install sidewalks or sidepaths on both sides of street to serve destinations along Carroll St and connect to New Lexington Schools campus; install marked crossing with Rectangular Rapid Flashing Beacon at key locations; upgrade existing signalized crossings to high-visibility markings. Refer to the Priority Projects section in Chapter 5 for detailed recommendations. |
| NL10 | Panther Dr NE | School entrance to Carroll St/SR 345 | Sidepath | Install sidepath on north side of street to connect New Lexington Schools campus to village. |
| NL11 | Lincoln St | Carroll St to Clayton St | Yield Roadway/Bicycle Boulevard | Install share the road signage/bicycle boulevard pavement markings to alert motorists of people walking and bicycling along narrow roadway. Provides low-stress alternative route to Broadway St. |
| NL12 | W Broadway St | SR 13 to Lowden St | Sidewalks | Install sidewalks on both sides of street for access to commercial destinations on Broadway. |
| NL13 | SR 37/W Main St/Thorn St/W Broadway St | Perry County Fairgrounds main entrance to SR 13 | Sidepath | Install sidepath on south and west sides of street to connect fairgrounds to village. |
| NL14 | W Broadway St, N Main St, and Monument St | Intersection | Crossing Improvement | Install high-visibility crosswalks along W Broadway St and across Monument Park to connect east and west sides of town. |
| NL15 | N Main St at railroad crossing | Railroad crossing | Crossing Improvement | Extend sidewalk to railroad ROW on both sides of street; mark path delineation for pedestrians and bicyclists to safely navigate rail crossing. See ODOT guidance for "Selecting Supplemental Treatments and Traffic Control Devices for Pedestrian and Bicycle At-Grade Crossings of Rail Lines." |
| NL16 | Union St and N Main St | Intersection | Crossing Improvement | Install high-visibility crosswalk and Rectangular Rapid Flashing Beacon to connect homes on west side of Main St to Save A Lot/Dollar General. |
| NL17 | Water St and N Main St | Intersection | Crossing Improvement | Install Rectangular Rapid Flashing Beacon to connect destinations on both sides of Main St and alert motorists of pedestrian activity. |
- New Lexington Recommendations
| Pedestrian Priority AreaRecommendations | |
| Yield Roadway | |
|---|---|
| Sidewalk | |
| Sidepath | |
| Crossing Improvement | |
| Regional Routes | |
| Signed Route | |
| Paved Shoulder | |
| Other Features | |
| Road | |
| Village | |
| Park/Open Space | |
& 16
- Map IDLocationExtentsFacility DescriptionNS1Ewing StMoss St to eastern terminusYield RoadwayInstall share the road signage to alert motorists of people walking along narrow roadway.NS2Main St and Clark StIntersection Crossing ImprovementUpgrade standard crosswalks on all intersection legs to high-visibility markings.NS3Ewing St and Clark StIntersection Crossing ImprovementUpgrade standard crosswalks on all intersection legs to high-visibility markings.NS4Northern Corporation Boundary on SR 93Corporation Boundaries on SR 93Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.NS5Western Corporation Boundary on SR 93Corporation Boundaries on SR 93Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.NS6Western Corporation Boundary on SR 595Corporation Boundaries on SR 595Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.NS7Eastern Corporation Boundary on SR 216Corporation Boundaries on SR 216Gateway/Traffic CalmingInstall landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists.
- New Straitsville Recommendations
- Somerset Recommendations
| Map ID | Location | Extents | Facility | Description |
|---|---|---|---|---|
| SO1 | Main St/US 22 and Columbus St/SR 13 | Intersection | Crossing Improvement | Upgrade standard crosswalks on all intersection legs to high-visibility markings. |
| SO2 | RR2D Shared Use Path Crossing at SR 13 | Trail Crossing | Crossing | Install high-visibility crosswalk and Rectangular Rapid Flashing Beacon for trail users crossing SR 13. |
| SO3 | Eastern Corporation Boundary on SR 13 | Corporation Boundaries on SR 13 | Gateway/Traffic Calming | Install landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists. |
| SO4 | Eastern Corporation Boundary on US 22 | Corporation Boundaries on US 22 | Gateway/Traffic Calming | Install landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists. |
| SO5 | Northern Corporation Boundary on SR 13 | Corporation Boundaries on SR 13 | Gateway/Traffic Calming | Install landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists. |
| SO6 | Western Corporation Boundary on US 22 | Corporation Boundaries on US 22 | Gateway/Traffic Calming | Install landscaping, welcome signage, art, and/or other gateway elements to encourage reduced speeds and caution from motorists. |
- Straitsville Recommendations
| Pedestrian Priority AreaRecommendations | |
| Yield Roadway | |
|---|---|
| Gateway/Traffic Calming | |
| Crossing Improvement | |
| Regional Routes | |
| Signed Route | |
| Shared Use Path | |
| Other Features | |
| Road | |
| Village | |
RR2B
RR1A
RR2A
- Somerset Recommendations
| Pedestrian Priority AreaRecommendations | |
| Gateway/Traffic Calming | |
|---|---|
| Crossing Improvement | |
| Regional Routes | |
| Signed Route | |
| Paved Shoulder | |
| Shared Use Path | |
| Other Features | |
| Road | |
| Village | |
| Park/Open Space | |
- Other Local Recommendations
| Map ID | Location | Extents | Facility | Description |
|---|---|---|---|---|
| Corning | ||||
| CO1 | SR 13/Jefferson Street | Corporation Boundaries | Paved Shoulder | Long-term alternative to RR5A (signed route): paved shoulder through Corning, extending to Athens County Line (not pictured on map). |
| Junction City | ||||
| JC1 | SR 37/Main Street | Corporation Boundaries | Sidewalk | Fill in sidewalk gaps, widen sidewalks in commercial district, and add streetscape features (trees, street furniture, decorative lighting, etc.) |
| Roseville | ||||
| RV1 | Zanesville Rd | Railroad St to N Main St | Sidewalk | Install sidewalk on west side of street to connect north part of village to downtown. |
| Shawnee | ||||
| SH1 | SR 93 and 2nd St | Intersection | Crossing Improvement | Install high-visibility crosswalk to connect Shawnee to Tecumseh Lake Trail. |
| Thornville | ||||
| TV1 | Zion Rd | N West St to Town Hwy 1062/1099 | Sidepath | Install sidepath on east side of street to connect Thornville to Thornport and Autumn at the Lake Rehabilitation and Nursing Center. |
| TV2 | Zion Rd | Town Hwy 1062/1099 to SR 13 | Sidepath | Install sidepath on east side of street to provide pedestrian and bicyclist accommodations through Thornport. |
- Junction City Recommendations
| Pedestrian Priority AreaRecommendations | |
| Sidewalk | |
|---|---|
| Regional Routes | |
| Paved Shoulder | |
| Shared Use Path | |
| Other Features | |
| Road | |
| Village | |
| Park/Open Space | |
JC1
- Roseville Recommendations
| Pedestrian Priority AreaRecommendations | |
| Sidewalk | |
|---|---|
| Regional Routes | |
| Signed Route | |
| Paved Shoulder | |
| Shared Use Path | |
| Other Features | |
| Road | |
| Village | |
| Park/Open Space | |
RV1
RR10B
- Shawnee Recommendations
| Pedestrian Priority AreaRecommendations | |
| Crossing Improvement | |
|---|---|
| Regional Routes | |
| Signed Route | |
| Paved Shoulder | |
| Other Features | |
| Road | |
| Village | |
SH1
- Thornville and Thornport Recommendations
| Pedestrian Priority AreaRecommendations | |
| Sidepath | |
|---|---|
| Regional Routes | |
| Signed Route | |
| Paved Shoulder | |
| Shared Use Path | |
| Other Features | |
| Road | |
| Village | |
| Park/Open Space | |
| Water Body | |
TV2
RR2F
TV1
RR1F
Bicycle parking in Downtown Dayton
Speed management is key a component of Vision Zero
Project Prioritization
The infrastructure recommendations in Chapter 5 are conceptual routes, meant to show the potential of a comprehensive active transportation system in Perry County. The recommendations are planning level in scope and are not necessarily constrained by existing challenges. Funding, land use, property rights, terrain, and other project specific factors may make certain recommendations less practicable than others. Project prioritization uses measurable data to determine which projects are both feasible, given real-world constraints, and align with stakeholders’ priorities.
As with most government agencies, Perry County has a limited amount of funding with which to build bicycle infrastructure. Because of this, it is imperative that the projects providing the most benefit be prioritized over others. A data-driven prioritization process uses GIS datasets to score and rank projects based on conditions in their relative locations.
Countywide recommendations (Regional Routes) were prioritized in an effort to build consensus between communities and develop shared active transportation goals. Local recommendations are not included in project prioritization - local government agencies and community members should prioritize these projects during implementation based on their communities’ unique needs.
It would be infeasible to fund, design, and construct a facility that spans the entire county all at once. Each Regional Route was divided into route segments to facilitate prioritization scoring and provide a more nuanced approach to implementation. Route segments were scored individually. For example, RR2F, a shared use path segment from Glenford to the Licking County Line, received a different score than RR2E, the trail segment from Somerset to Glenford.
Stakeholder Input Results
Public participation in the prioritization process is critical to ensure that final recommendations align with local needs. Community members had the opportunity to share their preferences for prioritization during a series of community engagement events in Fall 2019 (see Chapter 2).
Individuals were given five votes to distribute among their top priority projects. Community members and the Advisory Team cast over 250 votes on the 37 route segments that comprise the countywide bicycle network. The top ten projects are show in the graphic to the right.
While public opinion is an important determinant in identifying priority projects, it is not the only factor. The project prioritization process used six other criteria to evaluate and rank each countywide bicycle recommendation, which resulted in a balanced and data-driven analysis of potential projects.
Criteria
Criteria refer to general concepts that are important to consider during prioritization, such as safety and connectivity. Seven criteria were used to prioritize projects. They include both quantitative and qualitative measures. Data for all criteria were derived from national or statewide sources. Datasets included both internal ODOT sources and external datasets from other organizations. Average Annual Daily Traffic and crash data are examples of ODOT data. External sources include demographic data from the US Census. Criteria are shown in Table 12 and described in detail below. Each criteria has one or more variables. A variable is an individual measurement of some condition near a project.
Demand - Walk Bike Ohio, ODOT’s statewide bicycle and pedestrian plan, includes a demand analysis for walking and biking. This is a composite score based on employment, walking and biking mode share, poverty, population density, retail, parks, and the presence of colleges or universities.
Demand Variable - Area-weighted average demand score within a quarter-mile of each project. Uses census tract-level demand scores developed in the Walk Bike Ohio Analysis. The area-weighted average is intended to estimate demand scores when one project intersects more than one census tract. The percentage overlap is multiplied by the intersecting tract score and the final score is taken as the sum of demand scores by project.
Equity - Walk Bike Ohio also includes an equity analysis for the entire state. It created a composite equity score for every census tract in the state, with scores assigned based upon the presence of minority groups, youth, older adults, poverty, educational attainment, limited English proficiency, and motor vehicle access.
Equity Variable - Area-weighted average equity score within a quarter-mile of each project. Uses census tract-level total equity scores developed in the Walk Bike Ohio Analysis. The area-weighted average is intended to estimate equity scores when one project intersects more than one census tract. The percentage overlap is multiplied by the intersecting tract score and the final score is taken as the sum of equity scores by project.
Safety - Safety includes three different data sources: five-year crash history, posted speed, and traffic volumes. Research shows that motorized traffic speed and volume strongly influence bicycling behavior.26, 27, 28 These factors are critical considerations for bicyclist and pedestrian safety and comfort. Proximity to motor vehicle traffic is a significant source of stress, safety risks, and discomfort for bicyclists, and corresponds with sharp rises in crash severity and fatality risks for vulnerable users when motor vehicle speeds exceed 25 miles per hour.29
Safety Variables:
- Average Annual Daily Traffic – Scored as the maximum AADT value among the street segments which make up a project.
- Speed – Scored as the maximum speed limit among the streets segments which make up a project.
- Crashes – Bicycle and pedestrian crashes within 200 feet of each project weighted by severity rating. Source data includes all bike/pedestrian crashes in Perry County from 2014 - 2018 with severity ratings 1 – 4 based on degree of injuries reported. Weighting is applied by calculating the sum of the crash severity score within 200 feet.
Connectivity - Recommendations include a variety of route options and facility types for users of varying ability and experience level, with redundant and alternative routes built into the proposed network.
Connectivity Variable - Each route segment was scored on the number of other proposed routes that it connects to. This variable counts the number of connections to other proposed projects. Any other project within 200 feet of a project counts as a connection. Each segment is considered a project in and of itself, so it counts when 1A connects with 2A as well as when 1A connects with 1B.
Projects were also scored for connecting to other counties, to reward regional connectivity. Any project within 300 feet of the county border received extra points.
Synergy - It is typically more cost-effective to include active transportation improvements in larger transportation projects or as part of routine maintenance, such as resurfacing. The majority of the proposed network is on-street or in the right-of-way, which provides many opportunities for leveraging resources with other agencies.
Synergy Variable - Projects receive a point for overlap with ODOT District Work Plan projects.
Stakeholder Input - See Stakeholder Input Results section on page 74.
Cost - Facility types were assigned relative cost estimates: Signed Route = low cost, Paved Shoulder = medium cost, and Shared Use Path = high cost
Cost Variable - Measures relative cost of facility recommendation based on construction cost and prioritizes less-expensive projects. Ranking is as follows:
- Signed Route = 1 point
- Paved Shoulder = 0.66 points
- Shared Use Path = 0.33 points
Methodology
After calculating the individual variables, scores were scaled to values between zero and one. This is done by setting the lowest score equal to zero, the highest score equal to one, with the remaining scores falling somewhere in between them.
(project score - minimum score)maximum score - minimum score
Factors
A factor is the combination of similar variables into a sub score by category. The Safety Score and Stakeholder Input Score are both of this type. For final calculation, all other variables are weighted separately and therefore roughly equivalent to a factor.
scaled AADT +scaled speed limit +scaled crash score +Safety Score =3 client priority input +public engagment inputStakeholder Input Score =2
These factor scores were then scaled to values between zero and one using the methodology above.
Final Prioritization Score
The final score was calculated as the sum of the scaled factors with relative weights applied. The weighting scheme was presented to and developed in close coordination with Perry County and ODOT staff.
(scaled demand score x 20) +(scaled equity score x 20) +(scaled safety score x 20) +(scaled connectivity score x 15) + (scaled synergy score x5) (scaled stakeholder input score x 10) +(scaled project cost score x 10) Priority Score =
Prioritization rankings for each segment are listed in Chapter 5, Table 2, and Tables 13-15 on the following page. They are discussed in more detail in the Implementation Section. The top three priority projects are discussed in detail at the end of this chapter.
Implementation Approach
Implementing this plan will take time and significant effort. The following implementation strategy identifies short-, medium-, and long-term plan priorities and highlights those people or organizations responsible for moving priority projects forward. While the Advisory Team has been involved in this planning process, implementation will require working with a larger number of partners, as well as building public support for priority projects. In their professional capacities, members of the Advisory Team may be responsible for implementing specific plan recommendations. In their capacity as Advisory Team members, they will need to continue to support the Plan and garner community buy-in.
Short-, mid-, and long-term project phasing
Project phasing is based on the prioritization results. The top eight recommendations are classified as short-term project, the next eight recommendations are classified as medium-term projects, and the remaining recommendations are classified as long-term projects. Projects are shown in the tables below and in Maps 18-20 at the end of this section.
Short-Term (0-5 Years)
Short-term projects are the most important phase of implementation. Projects that are successfully completed early on in the process in a highly visible area with the potential to serve many users would generate excitement around the Plan and show Perry County’s commitment to expanding active transportation as a valid means of travel. As such, funding, community support, and political will to pursue the recommendations in this Plan will be most important during the first phase of implementation.
Short-term projects are clustered around the county’s urban areas, including New Lexington, Crooksville, and Roseville. Connections between urban areas would also be built during this phase, including widened shoulders between Somerset and Thornville, New Lexington and Shawnee, and Junction City and New Lexington.
Medium-Term (6-10 Years)
Projects completed during the medium-term phase of plan implementation would expand the countywide bicycle network to more communities and rural parts of the county, including Corning, Rendville, and New Straitsville. This phase would also establish improved accommodations on some of the county’s east-west corridors (US 22 and SR 37 in the eastern part of the county).
Long-Term (> 10 Years)
During the last phase of implementation, low-priority projects would significantly expand the county’s active transportation network. Full buildout would reach all communities in the county, establish more route alternatives between major destinations, and see the first sections of shared use path built.
Network Buildout
This is Perry County’s first coordinated effort to institute a countywide bicycle and pedestrian network. With virtually no bicycle facilities throughout the county and a very limited sidewalk network, Perry County is building its active transportation system from the ground up. Because institutional knowledge about implementing active transportation facilities may be lacking, it is paramount that the Advisory Team and other implementation leaders consult best practices in building the network. Suggested resources are listed below, and common steps and considerations in implementing active transportation plans are listed in Table 16 by facility type.
Bicycle and Pedestrian Resources for Engineers
Active Transportation Guide: A Reference for Communities
Active Transportation Guidance
Ohio Traffic Engineering Manual (TEM), Part 9 Bicycle Facilities
Location and Design (L&D) Manual, Sections 300, 400, 600, 700, & 800
Ohio Manual of Uniform Traffic Control Devices (OMUTCD), Part 9: Traffic Controls for Bicycle Facilities
Guidance to inform Pedestrian/Bicycle infrastructure at Railroad Crossings
Multimodal Design Guide (forthcoming)
Other
FHWA Small Town and Rural Design Guide
FHWA Achieving Multimodal Networks: Applying Design Flexibility and Reducing Conflicts
FHWA Bikeway Selection Guide
AASHTO Guide for the Development of Bicycle Facilities (2020 update forthcoming)
AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities
Evaluating Performance
Measuring the performance of active transportation networks is essential to ongoing success. Bicycle and pedestrian counts, crash records, and other data contribute to a business case for continued improvement of and investment in multimodal infrastructure. As recommendations in the Plan are constructed and programs are started, implementation leaders must be able to measure whether these investments are paying active transportation dividends (i.e. more people walking and bicycling). An affirmative answer reinforces the Plan’s legitimacy, and provides evidence that future investments will also yield positive results. The performance measures in Table 17 provide a framework for how Perry County can begin charting its progress towards making walking and biking safe, connected and comfortable. The Advisory Team should establish baseline targets and revisit these metrics as new plans and priorities occur. Data on these measures should be documented and published for public review annually. While considering these measures is a good starting point, Perry County would need to commit more time to develop a robust performance measures program. This includes establishing baseline measurements, performance targets, data collection frequency, and data collection and analysis responsibility. Active transportation performance measures guidance is listed below:
- Federal Highway Administration: Guidebook for Developing Pedestrian and Bicycle Performance Measures
- Fehr and Peers: Active Transportation Performance Measures
Priority Projects
The consultant team and Advisory Team members selected three projects for further study, with guidance from the public. The following pages describe each project in detail, including site analyses, recommendations, implementation considerations, and responsible parties. Planning-level cost estimates and conceptual renderings were developed for each project as well.
Project #1: NL9, Carroll Street Corridor Improvements
Carroll Street is not part of the proposed countywide bicycle network. However, this road holds countywide significance as the primary commercial corridor in Perry County. It was included in the prioritization scoring, and it was the top-ranked project among all 37 countywide recommendations.
Project #2: RR4C, Paved Shoulders on SR 13/37/93
This project ranked number two in the prioritization scoring. It would widen the paved shoulders on SR 13/37/93 east of New Lexington to accommodate bicyclists.
Project #3: RR2C Shared Use Path from Shawnee to Junction City
This recommendation was the top project among the public and Advisory Team members. While it did not score as highly in the quantitative project prioritization analysis (ranked 21st), it is important to put local priorities at the center of the implementation process. Focusing on projects that are popular will build momentum once the plan is adopted, generate good will and political support, and empower the public to realize its own vision for active transportation in Perry County.
Cost Estimates
Planning-level cost estimates are included for each project on the following pages. Opinions of probable cost were developed by identifying major pay items and establishing rough quantities to determine a rough order of magnitude cost. Additional pay items have been assigned approximate lump sum prices based on a percentage of the anticipated construction cost. Planning-level cost opinions include a 30% contingency to cover items that are undefined or are typically unknown early in the planning phase of a project. Unit costs are based on 2019 dollars and were assigned based on historical cost data from the Ohio Department of Transportation Historical Bid Data. Cost opinions do not include easement and right-of-way acquisition; permitting, inspection, or construction management; special site remediation, escalation, or the cost for ongoing maintenance. A cost range has been assigned to certain general categories such as drainage; however, these costs can vary widely depending on the exact details and nature of the work. The overall cost opinions are intended to be general and used only for planning purposes. Toole Design Group, LLC makes no guarantees or warranties regarding the cost estimate herein. Construction costs will vary based on the ultimate project scope, actual site conditions and constraints, schedule, and economic conditions at the time of construction.
SUP from Shawnee to Junction City
RR2C
SR 93 paved shoulders from Crooksville to Roseville
RR5E
SR 13 paved shoulders from Somerset to Thornville
RR1E ALT
SUP from Somerset to Glenford
RR2E
SR 13 paved shoulders from Shawnee to New Lexington
RR1C
Top 10 Stakeholder Projects
SR 13 paved shoulders from New Lexington to Somerset
RR1D ALT
SR 93/669 paved shoulders from SR 37 to Crooksville
RR5D
SR 204 paved shoulders from Thornville to Glenford
SR 155 signed route from Shawnee to Hemlock
SR 13 signed route from Athens County Line to Corning
RR5A
Votes
- Project Prioritization Criteria
| Factor | Data | Weight |
|---|---|---|
| Demand | Walk Bike Ohio Analysis | 20 |
| Equity | Walk Bike Ohio Analysis | 20 |
| Safety | 5-Year Crash History | 6 |
| Posted Speed | 7 | |
| Traffic Volumes | 7 | |
| Connectivity | Plan Recommendations | 7.5 |
| Connections to other counties | 7.5 | |
| Synergy | ODOT District Work Plans | 5 |
| Stakeholder Input | Advisory Team Priority Mapping | 5 |
| Public Engagement Priority Mapping | 5 | |
| Cost | Relative Facility Type Cost Estimates | 10 |
| Total | 100 | |
- Short-Term Projects
| Project | Facility | Rank |
|---|---|---|
| NL9 | Sidewalk | 1 |
| 4C | Paved Shoulders | 2 |
| 1A | Signed Route | 3 |
| 1E ALT | Paved Shoulders | 4 |
| 5E | Paved Shoulders | 5 |
| 1C | Paved Shoulders | 6 |
| 4A | Paved Shoulders | 7 |
| 4B | Paved Shoulders | 8 |
- Long-Term Projects
| Project | Facility | Rank |
|---|---|---|
| RR5 ALT | Shared Use Path | 17 |
| 9B | Signed Route | 18 |
| 9A | Paved Shoulders | 19 |
| 8B | Signed Route | 20 |
| 2C | Shared Use Path | 21 |
| 10B | Signed Route | 22 |
| RR7 | Signed Route | 23 |
| 1D | Signed Route | 24 |
| 10C | Signed Route | 25 |
| 1D ALT | Paved Shoulders | 26 |
| 5D | Paved Shoulders | 27 |
| 5C | Signed Route | 28 |
| 5B | Paved Shoulders | 29 |
| 2A | Shared Use Path | 30 |
| 2B | Shared Use Path | 31 |
| 2F | Shared Use Path | 32 |
| 5D ALT | Shared Use Path | 33 |
| 10A | Signed Route | 34 |
| RR6 | Signed Route | 35 |
| 2E | Shared Use Path | 36 |
| 2D | Shared Use Path | 37 |
- Medium-Term Projects
| Project | Facility | Rank |
|---|---|---|
| 3A | Paved Shoulders | 9 |
| 5A | Signed Route | 10 |
| 1E | Signed Route | 11 |
| 4D | Signed Route | 12 |
| 1B | Signed Route | 13 |
| 3B | Paved Shoulders | 14 |
| 1F | Signed Route | 15 |
| 4B | Paved Shoulders | 16 |
Implementation Approach
- Network Buildout Considerations
| Implementation Activity | Strategy | |
|---|---|---|
| S h a r e d U s e P a t h s | Acquisition | Contact property owners to determine feasibility of acquiring abandoned rail right-of-way for shared use path development. |
| Funding | Work with partner agencies (e.g. park district) to identify potential funding streams for right-of-way acquisition, design, construction, and maintenance. | |
| Alternatives | When shared use paths are not feasible, other bikeways which maximize user safety and comfort to the greatest extent practicable should be considered. For example, if the preferred bikeway is a shared use path and the current project is a street resurfacing, it may not be feasible for that project to install the shared use path. The only practical option may be the installation of a shoulder. | |
| P a v e d S h o ul d e r s | Project Identification and Development | Review ODOT District 5 resurfacing schedule. Work with District staff to pursue widened shoulders on priority routes identified in this Plan; upcoming resurfacing projects that do not overlap with Plan recommendations could also be considered for widened shoulders on a case by case basis (if significant bicycle activity exists or has the potential to develop along the route). |
| Dimensional Considerations | On routes where widened paved shoulders are recommended in this Plan, determine if preferred shoulder widths (see Chapter 5) can be constructed within existing right-of-way. If not, widen shoulders as much as possible: in highly constrained conditions where sufficient shoulder width cannot be achieved, it is preferable to provide a narrow shoulder rather than no shoulder. | |
| Drainage | Drainage is a challenging factor in rural areas. The presence of drainage swales can make wider paved shoulders fiscally challenging and often requires additional right-of-way (to site a facility on the private property side of the drainage, or cover the drainage with the facility, forcing it to move further away from the road). | |
| Alternatives | A separated shared use pathway or sidepath is a suitable alternative to providing paved shoulders. | |
| Signed Routes | Directional Signage | Identify key decision points along priority signed routes for signage placement. For long segments where decision points (i.e. intersections) do not exist, plan for wayfinding/directional signs every 2,640 feet (0.5 mile). |
| Determine responsibility for signage installation on state routes in urban areas. | ||
| List distances to key destinations on wayfinding signage in urban areas; in rural areas, list distances to nearby villages. | ||
| Regulatory and Warning Signage | Install Bikes May Use Full Lane (BMUFL) signs at corporation limits to all villages (R4-11 Manual on Uniform Traffic Control Devices). Consider BMUFL signs on priority bikeways in unincorporated areas and install Share the Road signs on all bikeways in unincorporated areas (MUTCD W16-1P). | |
| Pavement Markings | Pavement markings, such as sharrows, in between sign locations can supplement signed routes to alert motorists and inform bicyclists that they are still on the correct route. | |
| S i d e w a l k s | Expand Sidewalk Networks | While new development is concentrated in only a few locations throughout the county, communities expecting growth should establish ordinances or amend subdivision regulations to require sidewalk installation for all new developments at the time of street construction. |
| Transition to 100% public funding for new sidewalks in high pedestrian infrastructure demand areas (e.g. Carroll Street). | ||
| Fill in Sidewalk Gaps | Require sidewalk installation for all redevelopment projects. | |
| Crossings | Require high-visibility, protected crossings in high priority areas (e.g. Carroll Street). | |
- Recommended Performance Measures
| Bicycle Facilities | Increase miles of network built annually – target __% increase per year. |
|---|---|
| Increase amount of bicycle parking facilities annually. | |
| Semi-Annual Pedestrian and Bicycle Counts | After developing a baseline of pedestrian and bicycle activity, aim for year over year increases. |
| Update student travel tallies for all schools and identify a baseline percentage of students who walk and bike. Conduct travel tallies semi-annually and measure the change in the number of students walking and bicycling. | |
| Education Programming | Track the number of children and adults who participate in pedestrian and bicycle education programming every year. |
| Track public education campaigns and programs that include targeted efforts for law enforcement, students, traditionally underserved populations and other key stakeholders with target outreach goals set for 2025 and 2030. | |
| Safety | Track the number of crashes that occurs every year, including whether bicyclists or pedestrians were involved and the level of severity, if injuries occurred. |
| Reduce rate of bicycle/pedestrian and motor vehicle crashes – target __% decrease per year. | |
| Public Opinion | Conduct an annual active transportation survey to gauge resident comfort and opinion about active transportation in Perry County. |
| Mode Share | Establish countywide bicycle and pedestrian mode share goals– set milestones for 2025 and 2030. (Current mode share is 1.6% for pedestrians and 0% for bicyclists.) |
| Increase bicycle and pedestrian mode share target __% per year. | |
- Short-Term Projects
- Short and Medium-Term Projects
- Short, Medium, and Long-Term Projects
Project #1: NL9, Carroll Street Corridor Improvements
Background
- Site Limits - Railroad Street to Panther Drive.
- Land Use - Primarily commercial, some residential and industrial.
- Length - 0.5 miles.
Site Inventory
- Pedestrian Facilities - No sidewalks; partial marked crossings at Broadway, no other signalized crossings marked.
- Bicycle Facilities - None.
- Roadway - 11 to 13-foot lanes. In areas with shoulder, the available shoulder width is 1 to 2 feet. Dedicated turn lanes onto Broadway and northbound onto Lincoln Park Drive.
- Speed limit - 25 MPH from Railroad Street to corporation boundary, 35 MPH from corporation boundary to Panther Drive.
- Traffic volumes - 3,061 AADT.
Site Analysis
The Carroll Street Corridor is home to major employers, such as Cooper-Standard and Kroger, as well as many small businesses and destinations that are within walking and bicycling distance of New Lexington’s residential neighborhoods. As Perry County’s primary commercial district, it attracts significant motor vehicle traffic, transit trips, and pedestrian activity. Drive-thru restaurants, pharmacies, and gas stations pose access management challenges and create a hostile environment for people walking. For example, pedestrians on the east side of Carroll Street must cross over five driveway entrances in the 450-foot section between Broadway Street and Lincoln Park Drive. There is only one signalized marked crosswalk along the entire 0.5-mile segment. A lack of sidewalks forces people to walk in the grass or directly next to motorized traffic on the side of the road. Pedestrian demand paths or “goat paths” are worn into the ground along the entire corridor.
NL9 scored highly in the demand and equity categories, reflecting its densely populated surroundings and many destinations along the corridor. Students use Carroll Street to walk to and from the New Lexington Schools campus on Panther Drive. Kroger, one of the only full-service grocery stores in the county, attracts pedestrians from surrounding neighborhoods. The area also attracts heavy truck traffic, and experiences an average of 17 crashes per year, including a pedestrian-involved crash at Lincoln Street in 2016. Given this record of safety issues and the confluence of multimodal activity along Carroll Street, it is imperative to provide accommodations for active transportation users to ensure a safe and comfortable travel environment.
Recommendations
Recommendations include sidewalks or sidepaths on one or both sides of the street, depending on available right-of-way, upgrading existing signalized crossings to high-visibility crosswalks with Accessible Pedestrian Signals and ADA-compliant curbramps, and installing marked crossings with Rectangular Rapid Flashing Beacons (RRFBs) at key locations. The conceptual design on the following page shows a sidepath on the east side of Carroll Street from the north entrance to the Kroger parking lot, extending north to Panther Drive. Not pictured is a proposed sidepath on the west side of the street from Autozone Parts to Panther Drive. If right-of-way or funding do not allow for sidepaths on both sides of the street, the east side is preferable, because there are fewer driveways. RRFBs with marked crossings at Jefferson Street, Lincoln Street, and the north entrance to the Kroger parking lot are pictured; a fourth RRFB at Panther Drive is also recommended to connect to the sidepath on the east side of Carroll Street.
Implementation Considerations
ODOT District 5’s work plan for 2024 lists a microsurfacing project along SR 345, including Carroll Street from Broadway Street to Panther Drive, and continuing to the Muskingum County line. Microsurfacing is a preventive maintenance technique that extends pavement life. ODOT and other active transportation plan stakeholders should consider incorporating pedestrian improvements into routine maintenance projects such as this one whenever possible.
Responsible Parties
- New Lexington
- Perry County
- ODOT
Motor vehicle traffic along Carroll Street
Goat path along Carroll Street at Jefferson Street
Pedestrians walking along Carroll Street at Lincoln Street
- Carroll Street Corridor Pedestrian Improvements Cost Estimate (NL9)*
| Item | Unit | Quantity | Unit Cost | Total Cost | Assumptions |
|---|---|---|---|---|---|
| Excavation | CY | 1481 | $33.65 | $49,851.85 | |
| 6" Aggregate Base | CY | 889 | $95.01 | $84,453.33 | |
| 4" Concrete Walk | SF | 48000 | $6.64 | $318,720.00 | |
| 4" Base Pipe Underdrains | FT | 4800 | $11.74 | $56,352.00 | Addition of pipe underdrain along corridor |
| Combination Curb and Gutter, Type 2 | FT | 4800 | $34.08 | $163,584.00 | |
| Railroad Crossing | EA | 1 | $500,000.00 | $500,000.00 | Upgrade arms, may require OH electric adjustment |
| Signals | EA | 1 | $225,000.00 | $225,000.00 | Signalize Mill St |
| RRFB | EA | 3 | $80,000.00 | $240,000.00 | Hardwired RRFB |
| ADA Ramps | EA | 34 | $7,000.00 | $238,000.00 | |
| Opinion of Probable Cost Subtotal | $1,875,961.19 | ||||
| Landscaping/Turf Establishment (10%) | $187,596.12 | Includes allowance for street trees | |||
| Signing/Markings (2%) | $37,519.22 | ||||
| Lighting (25%) | $468,990.30 | Pedestrian scale lighting | |||
| Utility Relocations (15%) | $281,394.18 | ||||
| Drainage (30%) | $562,788.36 | ||||
| Contingency (30%) | $1,024,274.81 | ||||
| Total Opinion of Probable Cost | $4,438,524.16 | ||||
| Rounded Opinion of Probable Cost | $4,440,000.00 | ||||
| Rounded Opinion of Probable Cost; W/25% Engineering | $5,550,000.00 | ||||
*Assumes 10’ wide concrete sidepaths with signage and intersection crossing/curb ramp improvements along both sides of Carroll Street from Railroad Street to Panther Drive. The rendering on the following page shows a less costly version of NL9, with sidewalks south of Auto Zone parts (west side) and south of the north entrance to the Kroger parking lot (east side).
Also includes an allowance for drainage and landscaping.
Unit Prices per Ohio DOT Historical Bid Data Item Search (Sidewalk, 2015-2019).
All costs in 2018 dollars.
- Carroll Street Corridor Pedestrian Improvements Conceptual Design (NL9)
Continues to Panther Drive
High-visibility crosswalks
Sidepath
High-visibility crosswalks
Continues to Railroad Street
THIS
Project #2: RR4C, Paved Shoulders on SR 13/37/93
Background
- Site Limits - Dallas Avenue to Jamestown Road.
- Land Use - Primarily undeveloped, some residential and commercial.
- Length - 2.2 miles.
Site Inventory
- Pedestrian Facilities - None.
- Bicycle Facilities - None.
- Roadway - Ten to 11-foot lanes. Shoulder width is less than one foot in most areas, expanding to two to three feet around curves.
- Speed limit - 45 MPH from Dallas Avenue to Commerce Drive; 55 MPH from Commerce Drive to Jamestown Road.
- Traffic volumes - 4,437 AADT.
Site Analysis
This segment of SR 13/37/93 is a narrow two-lane road with frequent curves and sparse development. Several single-family homes are located on the south side of the road, with more homes and businesses in New Lexington village limits. West of the site, the road converges with Mill Street, a residential street with sidewalks, and continues through New Lexington.
RR4C scored highly in the safety category, indicating high traffic volumes and speeds and a history of crashes, including several involving pedestrians and bicyclists.
Recommendations
With daily traffic volumes approaching 4,500, some degree of separation between bicyclists and motorists is needed to maintain a comfortable travel environment. Widened shoulders could accommodate highly confident and somewhat confident bicyclists as they approach or exit New Lexington. Further east, past Jamestown Road, traffic volumes drop to 2,000 and the paved shoulders would narrow, with a signed route continuing to the county line (RR4D).
The conceptual design on the following page shows eight-foot wide shoulders in both directions with share the road warning signage (MUTCD W16-1P).
Rumble strips could be installed on the widened shoulders if a minimum of four feet of operating space remains for bicyclists, per FHWA best practices.30
Implementation Considerations
ODOT District 5’s work plan for 2020 lists a fast dry pavement marking project in both directions along SR 13/37/45, including the RR4C segment. While it is likely too late to incorporate shoulder widening into this project, lower-cost improvements, such as share the road signage, could be installed concurrently. ODOT and other active transportation plan stakeholders should consider incorporating bicycle improvements into routine maintenance projects such as this one whenever possible.
Responsible Parties
- New Lexington
- Perry County
- ODOT
Narrow shoulders on SR 13/37/93
SR 13/37/93 entering New Lexington
SR 13/37/93 approaching Six Mile Turn Auto Sales
- State Route 13/37/93 Paved Shoulders Cost Estimate (RR4C)*
| Item | Unit | Quantity | Unit Cost | Total Cost | Assumptions |
|---|---|---|---|---|---|
| Excavation of Subgrade | CY | 7982 | $18.05 | $144,070.20 | |
| 1 1/4" Asphalt Concrete Surface Course, Type I, (448) PG 64-22 | CY | 713 | $368.35 | $262,506.22 | |
| 1 3/4" Asphalt Concrete Intermediate Course, Type 2, (448) | CY | 998 | $183.25 | $182,831.47 | |
| 5" Asphalt Concrete Base, PG64-22 | CY | 2851 | $228.97 | $652,705.84 | |
| 6" Aggregate Base | CY | 3421 | $50.25 | $171,892.22 | |
| 6" Shallow Pipe Underdrains | FT | 23090 | $9.21 | $212,658.90 | Addition of pipe underdrain at shoulders |
| Opinion of Probable Cost Subtotal | $1,626,664.84 | ||||
| Grading/Landscaping/Turf Establishment (20%) | $325,332.97 | ||||
| Signing/Markings (5%) | $81,333.24 | ||||
| Drainage (20%) | $325,332.97 | ||||
| Contingency (30%) | $707,599.21 | ||||
| Total Opinion of Probable Cost | $3,066,263.23 | ||||
| Rounded Opinion of Probable Cost | $3,070,000.00 | ||||
| Rounded Opinion of Probable Cost; W/25% Engineering | $3,840,000.00 | ||||
*Assumes 8’ widepaved shoulder along SR 13/37/93 from Dallas Avenue to Jamestown Road.
Also includes an allowance for grading, drainage and landscaping.
Unit Prices per Ohio DOT Historical Bid Data Item Search (Major Widening, 2015-2019).
- State Route 13/37/93 Paved Shoulders Conceptual Design (RR4C)
Share the road warning sign
Continues to Jamestown Road
8-foot shoulder
8-foot shoulder
Continues to Dallas Avenue
Share the road warning sign
THIS
Project #3: RR2C, Shared Use Path from Shawnee to Junction City
Background
- Site Limits - Shawnee to Junction City.
- Land Use - Undeveloped.
- Length - 9.5 miles.
Site Inventory
- Pedestrian Facilities - None.
- Bicycle Facilities - None.
- Roadway - N/A (abandoned railroad right-of-way).
- Speed limit - N/A.
- Traffic volumes - N/A.
Site Analysis
The existing site travels along abandoned railroad right-of-way. The railroad was opened by the Newark, Somerset and Straitsville Railroad in 1867. The line was abandoned in 1927 and has been unused ever since.31
Recommendations
Repurposing this space for recreational use would provide a major economic boost to southern Perry County, similar to other rail trails in surrounding counties. The proposed shared use path would be part of the Emerald Necklace Greenway, a north-south trail that spans the entire county on abandoned railroad right-of-way. The RR2C segment would connect New Straitsville and Shawnee to Junction City. It was the top-ranked project among the public, indicating strong potential for attracting recreational walkers and riders to this part of the county.
The rendering on the following page shows one portion of the proposed trail crossing Dutch Ridge Road. High-visibility crosswalks and warning signage are pictured at the crossing. The 11-foot trail would accommodate three bicyclists riding side by side, as well as walkers and other trail users. As a potential future phase of the project, a spur could be constructed to connect the trail to New Lexington.
Implementation Considerations
Given the popularity of all terrain vehicles (ATVs) in southern Perry County, it is possible that ATV users may attempt to access the trail. However, motorized vehicles are usually prohibited from shared use paths to maintain a safe and quiet environment for people walking and bicycling. It is recommended to post signs at each trailhead and crossing prohibiting the use of motorized vehicles, and directing ATVs and other motorized users to unpaved trail systems elsewhere in the county constructed for that purpose. Bollards or posts at trail entrances could also discourage motor vehicle access.
Responsible Parties
- Shawnee
- Junction City
- Perry County
- Perry County Park District
Abandoned rail right-of-way along proposed shared use path alignment for RR2C
1898 map of Perry County railroads (source: Dan West)
- Shared Use Path from Shawnee to Junction City Cost Estimate (RR2C)*
| Item | Unit | Quantity | Unit Cost | Total Cost | Assumptions |
|---|---|---|---|---|---|
| Excavation of Subgrade | CY | 23887 | $16.81 | $401,534.35 | |
| 6" Aggregate Base | CY | 10237 | $79.80 | $816,922.94 | |
| 1 1/4" Asphalt Concrete Surface Course, Type I, (448) PG 64-22 | CY | 2133 | $268.30 | $572,212.89 | |
| 1 3/4" Asphalt Concrete Intermediat Course, Type 2, (448) | CY | 2986 | $215.99 | $644,909.31 | |
| 5" Asphalt Concrete Base, PG64-22 | CY | 8531 | $278.92 | $2,379,450.16 | |
| Structures | SF | 5100 | $400.00 | $2,040,000.00 | 5 water crossings, approx. 60' long, 17' wide |
| ADA Ramps | EA | 23 | $7,000.00 | $161,000.00 | |
| Opinion of Probable Cost Subtotal | $7,016,029.66 | ||||
| Landscaping/Turf Establishment (10%) | $701,602.97 | ||||
| Signing/Markings (5%) | $350,801.48 | ||||
| Drainage (30%) | $2,104,808.90 | ||||
| Contingency (30%) | $3,051,972.90 | ||||
| Total Opinion of Probable Cost | $13,225,215.90 | ||||
| Rounded Opinion of Probable Cost | $13,230,000.00 | ||||
| Rounded Opinion of Probable Cost; W/25% Engineering | $16,540,000.00 | ||||
*Assumes 11' wide asphalt path with signage and intersection crossing/curb ramp improvements in abandoned rail right-of-way from Shawnee to Junction City.
Also includes an allowance for drainage and landscaping.
Actual number of water crossings may be fewer than 5.
Unit Prices per Ohio DOT Historical Bid Data Item Search (Bikeways, 2015-2019).
- Shared Use Path from Shawnee to Junction City Conceptual Design (RR2C)
Stop sign
(trail traffic)
warning sign
11-foot shared use path
Continues to Junction City
Continues to Shawnee
High-visibility crosswalk